ANALISI EVOLUZIONE DELL'OMBRA INDOTTA DAGLI AEROGENERATORI SHADOW FLICKERING

Documenti analoghi
STUDIO SUGLI EFFETTI DI SHADOW- FLICKERING

REGIONE: PUGLIA PROVINCIA: FOGGIA COMUNE: SAN SEVERO Emissione ingg. Massimo Candeo e Gabriele Conversano ing.

REGIONE: PUGLIA PROVINCIA: FOGGIA COMUNE: BOVINO ELABORATO ALLEGATO ALLO STUDIO DI IMPATTO AMBIENTALE STUDIO EVOLUZIONE OMBRA (SHADOW FLICKERING)

ALL.2. PARCO EOLICO composto da 8 WTG da 4,2 MW/cad. ELABORATO ALLEGATO ALLO STUDIO DI IMPATTO AMBIENTALE STUDIO EVOLUZIONE OMBRA (SHADOW FLICKERING)

REGIONE: PUGLIA PROVINCIA: FOGGIA COMUNE: CASALVECCHIO ELABORATO ALLEGATO ALLO STUDIO DI IMPATTO AMBIENTALE

REGIONE: PUGLIA PROVINCIA: FOGGIA. COMUNI: CERIGNOLA ed ASCOLI SATRIANO STUDIO EVOLUZIONE OMBRA (SHADOW FLICKERING)

PROGETTO IMPIANTO EOLICO BRINDISI SANTA TERESA DI TOZZI GREEN S.p.a. CONTRODEDUZIONI DEL PROPONENTE AD OSSERVAZIONI SIEMENS GAMESA

DESCRIZIONE DEL SITO PREVISTO PER L IMPIANTO EOLICO

R E G I O N E S I C I L I A

A.9.A. INTRODUZIONE...2 A.9.B. MODELLO DI CALCOLO...4 A.9.C. RISULTATI...5

1.28. Spinazzola. Analisi dell'evoluzione dell'ombra indotta dagli aereogeneratori. Puglia Spinazzola (BT) RC Wind S.r.l. Progetto Definitivo

ffi snrc R I \, n N M o L Studio Tecnico Ing. Angelo Conte CASTtrLMAURO COMTJNE NOMI IMPIANTO: "EOLCAS" Eolico Castelrnauro

2017 Cambridge Exams

R E G I O N E S A R D E G N A

CENTRALE EOLICA MONTE CARBONE. A.8_ Studio degli effetti di shadow flickering

(provincia di Potenza)

1. PREMESSA 1 2. NORMATIVA 1

CALCOLI PRELIMINARI IMPIANTI

Regione Puglia. Provincia di Foggia. Comuni di San Paolo di Civitate e Poggio Imperiale

R E G I O N E S I C I L I A

Poggio Imperiale e San Paolo di Civitate (FG)

Analisi di producibilità eolica Sito: Monte Acuto Periodo: 01/01/ /12/2007 Quota: 40 m s.l.s. Turbina: GAMESA G58-850

CONTROLLO DELLA RADIAZIONE SOLARE

PROGETTO PER LA REALIZZAZIONE DI UN IMPIANTO DI PRODUZIONE DI ENERGIA ELETTRICA DA FONTE EOLICA DI POTENZA PARI A 36 MW PROGETTO DEFINITIVO

CONTROLLO DELLA RADIAZIONE SOLARE

11.1 Carta dei percorsi solari

Diagrammi solari e ostruzioni: progetto delle schermature

CAPITOLO 4 CONTROLLO DELLA RADIAZIONE SOLARE

Unipol Assicurazioni SpA Cumulative Auto Bologna 12/01/ :18

CASCATE E CATERATTE. energia eolica REALIZZAZIONE DI UNA CENTRALE EOLICA PER LA PRODUZIONE DI ENERGIA ELETTRICA IMPIANTO EOLICO CASALE NOVO

Exam of ELECTRONIC SYSTEMS June 15 th, 2012 Prof. Marco Sampietro

Tavola 1 - Prezzi al consumo relativi alla benzina verde con servizio alla pompa. Firenze, Grosseto, Pisa, Pistoia. Da Agosto 2008 ad Aprile 2012

AUTORIZZAZIONE UNICA

DATI SULLA PRODUZIONE ED OFFERTA DI ENERGIA ELETTRICA

REGIONE: PUGLIA PROVINCIA: FOGGIA. COMUNI: CERIGNOLA ed ASCOLI SATRIANO RELAZIONE GITTATA MASSIMA ELEMENTI ROTANTI

DATI SULLA PRODUZIONE ED OFFERTA DI ENERGIA ELETTRICA

MATT. POME. MATT. POME. MATT. POME. MATT. POME. MATT. POME. MATT. POME. MATT. POME. MATT. POME. MATT. POME. MATT. POME. MATT. POME.

Ente: COMUNE DI PORTICI

TRIS REGISTRO PROTOCOLLO /10/ C.27.a - I

DATI SULLA PRODUZIONE ED OFFERTA DI ENERGIA ELETTRICA

La diagnosi energetica, strumento. chiave per la riqualificazione degli edifici esistenti

Sun paths in the sky. Solar diagrams and obstructions: shading systems design. Sun paths in the sky. Sun paths in the sky

DATI SULLA PRODUZIONE ED OFFERTA DI ENERGIA ELETTRICA AGGIORNATI AL MESE DI OTTOBRE 2009

Indice della Relazione.

di Marcabruni Bruno & C. S.n.c. COSTRUZIONI MECCANICHE Via Linfano, ARCO (Tn)

DATI SULLA PRODUZIONE ED OFFERTA DI ENERGIA ELETTRICA

Standard Fee ISP Fee1 CRUI Fee2 92,50 70,00 70,00

Exam of ELECTRONIC SYSTEMS June 17 th, 2014 Prof. Marco Sampietro

DATI SULLA PRODUZIONE ED OFFERTA DI ENERGIA ELETTRICA AGGIORNATI AL MESE DI SETTEMBRE 2009

0 8 c h o o s e a h e a d

MINI EOLICO ENERGIA DAL VENTO

FTALab Laboratori di Fisica Tecnica Ambientale

CAMPAGNA ANEMOMETRICA DEL PARCO EOLICO: MISURAZIONI PER ANALISI ENERGETICHE E FUNZIONALI

Studio di un sistema combinato di microgenerazione a ridotto impatto ambientale

Rete di monitoraggio della qualità dell aria della Provincia di Rimini Report 2012

1-Scheda Obiettivo-ISTRUTTORIA ED APPROVAZIONE STRUMENTI URBANISTICI ESECUTIVI, REGOLAMENTI E PROGETTI URBANISTICI

ALLEGATO J ATMOSFERA, CARATTERIZZAZIONE METEOCLIMATICA STUDIO DI IMPATTO AMBIENTALE

Studio di Pre-Fattibilità Impianto Fotovoltaico connesso alla rete

Energia Eolica. Tecnologie delle Energie Rinnovabili. Daniele Cocco

DATI SULLA PRODUZIONE ED OFFERTA DI ENERGIA

mercato libero ADEMPIMENTI DELIBERA 164/08 e s.m.i.

Ecotect Radiance. Architettura e Innovazione Elementi di Acustica e Illuminotecnica. Nicola Busatto Università IUAV - Venezia

NDCMG NDCMG MOTORIDUTTORI C.C. AD INGRANAGGI CILINDRICI RARE EARTH D.C. HELICAL GEARMOTORS

DATI SULLA PRODUZIONE ED OFFERTA DI ENERGIA ELETTRICA

Luca Dei Cas Centro di Monitoraggio Geologico ARPA Lombardia

REGIONE: PUGLIA PROVINCIA: FOGGIA. COMUNE di SAN SEVERO. PARCO EOLICO SAN SEVERO La Penna composto da 14 WTG da 3,40MW/cad.

ITALIA - IMMATRICOLAZIONI AUTOVETTURE ITALY - NEW CAR REGISTRATIONS

EN IT. Computer Manual. Manuale computer. Console

TS8 - TS8F TS8W - TS8WF TS8 TS8F TS8W TS8WF

NDCMG. Motoriduttori CC ad ingranaggi cilindrici DC helical in-line gearmotors NDCMG NDCMG. Neodymium

Emissione galattica diffusa

DATI GENERALI E CLIMATICI DELLA LOCALITA' SESTRI LEVANTE Provincia: GE

Energia Eolica. Tecnologie delle Energie Rinnovabili. Daniele Cocco

Energia Eolica. Tecnologie delle Energie Rinnovabili. Daniele Cocco

IMPIANTO IDROELETTRICO SU FIUME TOCE CON DERIVAZIONE SCARICO CENTRALE DI CADARESE

Call For Scores. Il Contrabbasso Contemporaneo

Energia dal vento. Gli impianti eolici. Stefano DUGLIO Dipartimento di Management, Sezione di Scienze merceologiche

DIAGRAMMA DI GANTT Cronoprogramma dei lavori (D.Lgs 9 aprile 2008 n. 81, Art. 100 e Allegato XV)

CENTRALE EOLICA OFF-SHORE GOLFO DI MANFREDONIA. Capitaneria di Porto di Manfredonia (FG) Oggetto: Valutazione preliminare di impatto acustico.

INTECNO TRANSTECNO. MICRO Encoder ME22 ME22 MICRO Encoder. member of. group

Contribuenti Scadenza Denominazione Descrizione

Standard Fee ISP Fee1 CRUI Fee2 92,50 70,00 70,00

CONTROLLO DELLA RADIAZIONE SOLARE

Proponente. Breva Wind Srl. Via Roberto Lepetit, 8/ Milano (MI) Consigliere delegato Ing. Gianluca Veneroni

DATI SULLA PRODUZIONE ED OFFERTA DI ENERGIA ELETTRICA

MANUALE DI ISTRUZIONI MOVIMENTO VD51 Cronografo con secondi e minuti

IMPIANTO MINIEOLICO MORIA INDICE.

Calendario didattico a.a University calendar a.y

ITALIA - IMMATRICOLAZIONI AUTOVETTURE ITALY - NEW CAR REGISTRATIONS

ATMOSFERA, CARATTERIZZAZIONE METEOCLIMATICA

GEN FEB MAR APR MAG GIU LUG AGO SET

CAMPIONATO NAZIONALE UNDER 15 LEGA PRO stagione sportiva 2016/2017 CALENDARIO Girone A

Energia Eolica. Tecnologie delle Energie Rinnovabili

Algoritmi Priority-Driven RT. Corso di Sistemi RT Prof. Davide Brugali Università degli Studi di Bergamo

Introduzione al Solare fotovoltaico. Progetto di un impianto fotovoltaico

REMOTE CONDENSER INDUSTRIAL TURBO LINE UP TO 910 KW!! SERIES. High performance series More than 500 different models

RAPPORTO MENSILE SUL SISTEMA ELETTRICO CONSUNTIVO OTTOBRE 2015

Report di Produzione Aerogeneratore eolico FX-21

Il valore nella Consumer Technology: problemi ed opportunità attraverso le turbolenze del mercato

4.2.6K. Valutazione Risorsa Eolica e Analisi di Producibilità. Parco Eolico Cerignola _ Borgo Libertà

Transcript:

IMPIATO DI PRODUZIOE DI EERGIA DA FOTE EOLICA POTEZA OMIALE 34,5 MW REGIOE PUGLIA PROVICIA di BRIDII COMUE di BRIDII Località: anta Teresa, pecchione, Pozzella, colpito PROGETTO DEFIITIVO Id AU 8G4G71 Tav.: Titolo: R29 AALII EVOLUZIOE DELL'OMBRA IDOTTA DAGLI AEROGEERATORI HADOW FLICKERIG cala:.a. Formato tampa: A4 Codice Identificatore Elaborato 8G4G71_Documentazionepecialistica_29 Progettazione: Committente: TC.r.l. TC Via V. M. TAMPACCHIA, 48-731 Lecce Tel. +39 832 98355 studiocalcarella@gmail.com - fabio.calcarella@gmail.com Via Brigata Ebraica, 5-48123 Mezzano (RA) Tel. +39 544 525311 - Fax +39 544 5253 pec: tozzi.re@legalmail.it - www.tozziholding.com Direttore Tecnico: Dott. Ing. Fabio CALCARELLA Data Motivo della revisione: Redatto: Controllato: Approvato: 31 luglio Prima emissione TC FC TOZZI GREE.p.a.

1. HADOW FLICKERIG Lo shadowflickering consiste in una variazione periodica dell intensità luminosa osservata, causata dalla proiezione, su una superficie, dell ombra indotta da oggetti in movimento. Per un impianto eolico tale fenomeno è generato dalla proiezione, al suolo o su un ricettore, dell ombra prodotta dalle pale in rotazione degli aerogeneratori. Dal punto di vista di un ricettore, lo shadowflickering si manifesta in una variazione ciclica dell intensità luminosa: in presenza di luce solare diretta, un ricettore localizzato nella zona d ombra indotta dal rotore, sarà investito da un continuo alternarsi di luce diretta ed ombra, causato dalla proiezione delle ombre dalle pale in movimento. Tale fenomeno se vissuto dal recettore per periodi di tempo non trascurabile può generare un disturbo, quando: si sia in presenza di un livello sufficiente di intensità luminosa, ossia in condizioni di cielo sereno sgombro da nubi ed in assenza di nebbia e con sole alto rispetto all orizzonte; la linea recettore aerogeneratore non incontri ostacoli: in presenza di vegetazione o edifici interposti l ombra generata da quest ultimi annulla il fenomeno. Pertanto, ad esempio, qualora il ricettore sia un abitazione, perché si generi lo shadow flickering le finestre dovrebbero essere orientate perpendicolarmente alla linea recettore aerogeneratore e non affacciarsi su ostacoli (alberi, altri edifici, ecc.); la turbina sia orientata in modo che il rotore risulti perpendicolare alla linea sole recettore:quando il piano del rotore è perpendicolare alla linea sole recettore, l ombraproiettata dalle pale risulta muoversi all interno di un cerchio che riferisce allacirconferenza del rotore inducendo uno shadow flickeringnon trascurabile; per situazioniin cui, dal punto di vista del recettore, il piano del rotore risulti essere in linea con il soleed il recettore, l ombra proiettata è sottile, di bassa intensità ed è caratterizzata da unrapido movimento, risultando pertanto lo shadow flickeringdi entità trascurabile; la posizione del sole sia tale da indurre una luminosità sufficiente. Ciò si traduce, inriferimento alla latitudine di progetto, in un altezza del sole pari ad almeno 15 ; le pale siano in movimento; turbina e recettore siano vicini: le ombre proiettate in prossimità dell aerogeneratore risultano di maggiore intensità e nitidezza rispetto a quelle proiettate lontano. Quando una turbina è posizionata sufficientemente vicino al recettore, così che una porzione ampia dipala copra il sole (così come osservato dal punto di vista del recettore), l intensità del flicker risulta maggiore. All aumentare della distanza tra turbina e recettore, le pale coprono unaporzione sempre più piccola del sole, inducendo un flicker di minore entità. Inoltre ilfenomeno risulta di bassa entità quando l ombra proiettata sul recettore è indotta dall estremità delle pale (rotor tip); raggiunge il massimo dell intensità incorrispondenza dell attacco di pala all hub. Pertanto, in riferimento a quanto sin qui esposto, durata ed entità dello hadow flickering sono determinate e condizionate:

dalla distanza tra aerogeneratore e recettore; dalla direzione ed intensità del vento; dall orientamento del recettore; dalla presenza o meno di ostacoli lungo la linea di vista recettore aerogeneratore sole; dalle condizioni meteorologiche; dall altezza del sole. 2. CALCOLO DELL OMBRA Lo shadowflickering consiste in una variazione periodica dell intensità luminosa osservata, causata dalla Al fine di verificare la sussistenza del fenomeno dello shadow flickering indotto dalle opere inprogetto sono state effettuate simulazioni in considerazione: del diagramma solare riferito alla latitudine di installazione del parco; dell altezza complessiva di macchina, intesa quale somma tra l altezza del mozzo e lalunghezza di pala; dall orientamento del rotore rispetto al ricettore; della posizione del sole e quindi della proiezione dell ombra rispetto ai recettori; della posizione dei possibili recettori. Le simulazioni effettuate con l ausilio del programma facendo le seguenti assunzioni: - la massima distanza di influenza pari a 1.7 m è stata calcolata solo quando più del % del sole è coperto dalla pala; - altezza minima del sole sull orizzonte 3 ; - probabilità di sole per (probabilità di ore di sole al giorno), secondo quanto riportato in tabella Gen Feb Mar Apr Mag Giu Lug Ago et Ott ov Dic - le ore di funzionamento dell impianto, in relazione anche alla direzione del vento, sono state calcolate sulla base di dati statistici elaborati dallo stesso programma. i rammenta a tal proposito che è uno dei programmi più utilizzati per il calcolo della producibilità degli impianti eolici - un aerogeneratore è stato considerato visibile quando è completamente visibile dalle finestre del ricettore - sono stati individuati nell area di impianto 11 ricettori sensibili (edifici rurali abitati), rispetto ai quali è stato effettuato il calcolo - non sono stati considerati eventuali ostacoli interposti tra i recettori e la turbina eolica

- la simulazione è stata altresì condotta non considerando l orografia del terreno in quanto non ha una influenzasignificativa sulla proiezione delle ombre per via dell andamento plano altimetricopraticamente piatto dell area di esame. Il programma effettua il calcolo delle ore del giorno in cui si potrebbe avere l effetto del flickering sul ricettore, facendo la somma dei minuti. Effettua poi la somma teorica dei minuti di ciascun mese (worst case) che poi viene ridotta in considerazione delle giornate soleggiate, dell operatività effettiva dell impianto eolico, della direzione del vento. i ottengono così i dati sinteticamente riportati in tabella per ciascun ricettore individuato. RICETTORE AEROGEERATORE (che genera il flickering) ORARIO DURATA MAIMA EL MIUTI REALI TOTALI EL A 8 3-25 marzo 6-7 del mattino min 15 A 8-3 settembre 7-8 del mattino min 122 A 8 1-11 ottobre 7-8 del mattino min 83 RICETTORE AEROGEERATORE (che genera il flickering) ORARIO DURATA MAIMA EL MIUTI REALI TOTALI EL B EUO EUO RICETTORE AEROGEERATORE (che genera il flickering) ORARIO DURATA MAIMA EL MIUTI REALI TOTALI EL C EUO EUO RICETTORE AEROGEERATORE (che genera il flickering) ORARIO DURATA MAIMA EL MIUTI REALI TOTALI EL D 4-31 gennaio 7-8 del mattino 39 min 85 min D 4 1-23 febbraio 7-8 del mattino min 2 min D 5 4- aprile 6-7 del mattino min min D 5 27-31 agosto 6-7 del mattino min min D 5 1-8 settembre 6-7 del mattino min 28 min D 4-31 ottobre 7-8 del mattino 42 min 139 min D 4 1-22 novembre 7-8 del mattino 44min 222min

RICETTORE AEROGEERATORE (che genera il flickering) ORARIO DURATA MAIMA EL MIUTI REALI TOTALI EL E 4 1 gen-2feb 7-8 del mattino min 3min E 5 27mar-1 apr 6-7 del mattino min 45min E 5 2-15 settembre 6-7 del mattino min 58min E 4 9nov-31dic 7-8 del mattino min 673min RICETTORE AEROGEERATORE (che genera il flickering) ORARIO DURATA MAIMA EL MIUTI REALI TOTALI EL F 5 4- marzo 6-7 del mattino 25min 63min F 5 24sett-9ott 7-8mattino 25min 84min RICETTORE AEROGEERATORE (che genera il flickering) ORARIO DURATA MAIMA EL MIUTI REALI TOTALI EL G 5 13mar-5 apr 6-8 del mattino 38min 156min G 6-29apr 6-7mattino min 48min G 6 14-27ago 6-7mattino min min G 5 7sett-1ott 7-8 mattino 38min 232min RICETTORE AEROGEERATORE (che genera il flickering) ORARIO DURATA MAIMA EL MIUTI REALI TOTALI EL H 6 26feb-11mar 6-7 del mattino 21min min H 7 23mar-9apr 5-7 pomeriggio 28min 88min H 7 3-sett 6-7pomeriggio 28min 115min H 6 2-ott 7-8mattino 22min 61min RICETTORE AEROGEERATORE (che genera il flickering) ORARIO DURATA MAIMA EL MIUTI REALI TOTALI EL I 6 1-24feb 7-8 del mattino 21min 5min I 7 3-mar 5-6 pomeriggio 28min 63min I 7 24sett-11ott 5-7 pomeriggio 28min 96min I 6 ott-1nov 5-7 pomeriggio 21min 54min RICETTORE AEROGEERATORE (che genera il flickering) ORARIO DURATA MAIMA EL MIUTI REALI TOTALI EL L 6 27gen-27feb 7-8 del mattino min 276min L 8 3giu-1lug 7-8 pomeriggio min 239min L 6 15ott-15nov 8-9 della sera 44min 3min

RICETTORE AEROGEERATORE (che genera il flickering) ORARIO DURATA MAIMA EL MIUTI REALI TOTALI EL M 1 8apr-4mag 6-7 pomeriggio min 3min M 1 8ago-4sett 6-8 pomeriggio min 283min 3. COCLUIOI L effetto dello shadow flickering sui potenziali ricettori presenti nell area è trascurabile, poiché - i presenta per periodi limitati dell anno; - i presenta per un periodo molto limitato di minuti durante la giornata, tipicamente tra le 6 e le 7 del mattino o tra le 7 e le otto del mattino, e tipicamente per circa mezz ora; - Inoltre studi scientifici hanno accertato che frequenze inferiori a 1 Hz non hanno alcuna correlazione con attacchi di natura epilettica, mentre nel caso in esame l effetto dell ombra ha nel caso peggiore una frequenza di.8 Hz. Infine per quanto attiene all ombra che si manifesta sulla P ex65 notiamo che: - Date le latitudini l ombra non può generare ghiaccio sulla sede stradale; - È interessato dal fenomeno un tratto stradale molto breve (circa 2 km), e solo un tratto di un centinaio di metri per oltre 25 ore l anno. Riteniamo, che anche in questo caso l effetto dello shadow flickering, sia irrilevante.

HADOW - Main Result Maximum distance for influence Calculate only when more than % of sun is covered by the blade Please look in WTG table Minimum sun height over horizon for influence Day step for calculation Time step for calculation 3 1 days 1 minutes Operational hours are calculated from WTGs in calculation and wind distribution: ite data: WAsP (2) E EE E EE E W WW W WW W um A ZVI (Zones of Visual Influence) calculation is performed before flicker calculation so non visible WTG do not contribute to calculated flicker values. A WTG will be visible if it is visible from any part of the receiver window. The ZVI calculation is based on the following assumptions: Height contours used: Height Contours: COTOURLIE_OLIEDATA_.wpo Obstacles used in calculation Eye height: 1,5 m Grid resolution: 1, m OpentreetMap contributors - www.openstreetmap.org/copyright All coordinates are in cale 1:5. UTM (north)-wg84 Zone: 33 ew WTG hadow receptor WTGs 1 2 3 4 5 6 7 8 9 1 Easting orthing Z 744.44 744.739 745.1 745.552 746.414 7.115 744.759 745.423 746.96 745.555 4.486.3 4.486.657 4.486.99 4.487.1 4.487.653 4.488.69 4.488.279 4.488.91 4.489.746 4.49.4 [m] 7, 7, 68,7 65, 63,8 6, 65, 62,7 6, 64,4 WTG type Valid Manufact. Type-generator Row data/description VETA VETA VETA VETA VETA VETA VETA VETA VETA VETA 12...Yes 12...Yes 12...Yes 12...Yes 12...Yes 12...Yes 12...Yes 12...Yes 12...Yes 12...Yes VETA VETA VETA VETA VETA VETA VETA VETA VETA VETA -3.45-3.45-3.45-3.45-3.45-3.45-3.45-3.45-3.45-3.45 Power, rated [kw] 3.45 3.45 3.45 3.45 3.45 3.45 3.45 3.45 3.45 3.45 Rotor diameter [m] 126, 126, 126, 126, 126, 126, 126, 126, 126, 126, hadow data Hub Calculation RPM height distance [m] [m] [RPM] 1.7 13,4 1.7 13,4 1.7 13,4 1.7 13,4 1.7 13,4 1.7 13,4 1.7 13,4 1.7 13,4 1.7 13,4 1.7 13,4 hadow receptor-input o. A B C D E F G H I L M Easting orthing Z 744.6 745.146 7.49 744.941 745.44 745.235 745.665 745.83 745.787 746.5 745.223 4.489. 4.489.69 4.489.1 4.487.4 4.487.53 4.487.84 4.487.7 4.488.311 4.488.51 4.488.358 4.486.25 [m] 65, 65, 58,6 65, 65, 65, 65, 62,5 61,7 6, 7, Width Height Height Degrees from lope of a.g.l. south cw window [m] [m] [m] [ ] [ ], 9,, 9,, 9,, 9,, 9,, 9,, 9,, 9,, 9,, 9,, 9, 3.1.6 by EMD International A/, Tel. +45 96 35 44 44, www.emd.dk, windpro@emd.dk Direction mode "Green "Green "Green "Green "Green "Green "Green "Green "Green "Green "Green house house house house house house house house house house house mode" mode" mode" mode" mode" mode" mode" mode" mode" mode" mode" 15-7- 15:46 / 1

HADOW - Main Result Calculation Results hadow receptor hadow, expected values o. hadow hours per year [h/year] A 5:54 B : C : D 12:25 E F 2:27 G 7:54 H 5:8 I 4:21 L 14:12 M 8:6 Total amount of flickering on the shadow receptors caused by each WTG o. ame 1 2 3 4 5 6 7 8 9 1 VETA VETA VETA VETA VETA VETA VETA VETA VETA VETA 126. 126. 126. 126. 126. 126. 126. 126. 126. 126.!O!!O!!O!!O!!O!!O!!O!!O!!O!!O! hub: hub: hub: hub: hub: hub: hub: hub: hub: hub: m m m m m m m m m m (TOT: (TOT: (TOT: (TOT: (TOT: (TOT: (TOT: (TOT: (TOT: (TOT:,,,,,,,,,, m) m) m) m) m) m) m) m) m) m) Worst case Expected [h/year] [h/year] 26:28 8:6 (2) : : (3) : : 98:51 28:3 4:5 1:3 57:1 15: 25:48 5: 31:44 9:54 (9) : : (1) : : Total times in Receptor wise and WTG wise tables can differ, as a WTG can lead to flicker at 2 or more receptors simultaneously and/or receptors may receive flicker from 2 or more WTGs simultaneously. 3.1.6 by EMD International A/, Tel. +45 96 35 44 44, www.emd.dk, windpro@emd.dk 15-7- 15:46 / 2

HADOW - Calendar hadow receptor: A - hadow Receptor: Azimuth:, lope: 9, E EE E EE E W WW W WW W um January February March 2 3 4 5 6 7 8 9 1 11 12 13 14 15 21 22 23 24 25 26 27 28 29 3 31 Potential sun hours Total, worst case un reduction Oper. time red. Wind dir. red. Total reduction Total, real :3 :15 :27 :52 :12 13 24 27 3 31 33 34 35 35 34 32 31 28 26 22 1 663,44,54,23 15 April May June July August eptember October : : : 5: 5: : :1 :2 :3 :3 :4 :5 :6 :7 :8 :9 :1 :1 :11 :12 :13 :13 5: :14 5: :15 :15 : : : : : : : : : :21 :21 :22 :22 :22 :23 :23 :23 :23 :23 :23 5: :24 5: :24 5: :24 :24 :24 451 :23 :23 :23 :23 :23 :23 :22 :22 :22 :21 :21 : : : : : : : : : :15 5: :14 5: :13 :13 :12 :11 :1 :9 :8 :7 :6 :5 :4 :3 :2 :1 : :55 : 7 21 25 28 3 32 33 34 35 5,63,54,33 122 7:31 7:38 7:26 7:42 7:22 7: 7: 7:45 7: 7:46 7: 7: 7: 7:48 7:15 7:48 7:14 7:48 7:48 7:48 7:48 7:48 : : :14 :51 ovemberdecember 35 34 32 31 28 26 22 1 7: 7: 7:46 7:45 7:44 7: 7:41 7:14 7:4 7: 7:39 7: 7: 7:22 7:32 37,52,54,27 83 :31 :31 :3 :29 :28 :28 :27 :27 :26 :25 :25 :25 :24 :24 :23 :23 :23 :23 :22 :22 :22 :22 :22 :22 :22 :22 :22 :22 :23 :23 :23 :23 :24 :24 :24 :25 :25 :26 :26 :27 :28 :28 :29 :3 :3 :31 29 un rise (hh:mm) un set (hh:mm) Minutes with flicker First time (hh:mm) with flicker Last time (hh:mm) with flicker 3.1.6 by EMD International A/, Tel. +45 96 35 44 44, www.emd.dk, windpro@emd.dk (WTG causing flicker first time) (WTG causing flicker last time) 15-7- 15:46 / 3

HADOW - Calendar hadow receptor: B - hadow Receptor: Azimuth:, lope: 9, (2) E EE E EE E W WW W WW W um January February March 2 3 4 5 6 7 8 9 1 11 12 13 14 15 21 22 23 24 25 26 27 28 29 3 31 Potential sun hours Total, worst case un reduction Oper. time red. Wind dir. red. Total reduction Total, real :51 :3 :15 :27 :52 :12 April May June July August eptember October ovemberdecember : : : : 5: 5: : :1 :2 :3 :3 :4 :5 :6 :7 :8 :9 :9 :1 :11 :12 :13 :13 5: :14 5: :15 :15 : : : : : : : : : :21 :21 :22 :22 :22 :23 :23 :23 :23 :23 :23 5: :24 5: :24 5: :24 :24 :24 451 :23 :23 :23 :23 :23 :23 :22 :22 :22 :21 :21 : : : : : : : : : :15 5: :14 5: :13 :13 :12 :11 :1 :9 :8 :7 :6 :5 :4 :3 :2 :1 : :55 : 5 : : :13 :51 :31 :31 :3 :29 :28 :28 :27 :27 :26 :25 :25 :25 :24 :24 :23 :23 :23 :23 :22 :22 :22 :22 :22 :22 :22 :22 :22 :22 :23 :23 :23 :23 :24 :24 :24 :25 :25 :26 :26 :27 :28 :28 :29 :3 :3 :31 289 un rise (hh:mm) un set (hh:mm) Minutes with flicker First time (hh:mm) with flicker Last time (hh:mm) with flicker 3.1.6 by EMD International A/, Tel. +45 96 35 44 44, www.emd.dk, windpro@emd.dk (WTG causing flicker first time) (WTG causing flicker last time) 15-7- 15:46 / 4

HADOW - Calendar hadow receptor: C - hadow Receptor: Azimuth:, lope: 9, (3) E EE E EE E W WW W WW W um January February March 2 3 4 5 6 7 8 9 1 11 12 13 14 15 21 22 23 24 25 26 27 28 29 3 31 Potential sun hours Total, worst case un reduction Oper. time red. Wind dir. red. Total reduction Total, real :51 :58 :3 :9 :14 : :26 :33 :41 :51 :52 April May June July August eptember October ovemberdecember :12 : : : : 5: 5: : :1 :1 :2 :3 :4 :5 :6 :7 :8 :9 :9 :1 :11 :12 :12 5: :13 5: :14 5: :15 :15 : : : : : : : : : :21 :21 :21 :22 :22 :22 :23 :23 :23 :23 :23 :23 5: :23 5: :23 :23 :23 451 :23 :23 :23 :23 :23 :22 :22 :22 :22 :21 :21 : : : : : : : : : :15 5: :14 5: :13 :12 :12 :11 :1 :9 :8 :7 :6 :5 :4 :3 :2 : : :4 :59 :54 : 5 :24 : : :13 :51 :31 :31 :3 :29 :28 :28 :27 :26 :26 :25 :25 :24 :24 :24 :23 :23 :23 :22 :22 :22 :22 :22 :22 :22 :22 :22 :22 :22 :22 :23 :23 :23 :24 :24 :24 :25 :25 :26 :26 :27 :28 :28 :29 :3 :3 :31 29 un rise (hh:mm) un set (hh:mm) Minutes with flicker First time (hh:mm) with flicker Last time (hh:mm) with flicker 3.1.6 by EMD International A/, Tel. +45 96 35 44 44, www.emd.dk, windpro@emd.dk (WTG causing flicker first time) (WTG causing flicker last time) 15-7- 15:46 / 5

HADOW - Calendar hadow receptor: D - hadow Receptor: Azimuth:, lope: 9, E EE E EE E W WW W WW W um January 2 3 4 5 6 7 8 9 1 11 12 13 14 15 21 22 23 24 25 26 27 28 29 3 31 Potential sun hours Total, worst case un reduction Oper. time red. Wind dir. red. Total reduction Total, real :4 February 9 23 26 29 31 33 35 39 7:42 7:51 7:38 7:54 7: 7:57 7: 7:59 7:34 8: 7:34 8:3 7:33 8:4 7:32 8:5 7:31 8:6 7:3 8:7 7:3 8:7 7:29 8:8 335,39,67,25 85 :15 :27 4 4 42 42 44 42 42 41 39 38 34 32 28 25 21 15 7:29 8:9 7:29 8:9 7:28 8:1 7:28 8:1 7:28 8:11 7:28 8:11 7:28 8:12 7:29 8:12 7:29 8:12 7:28 8:11 7:29 8:11 7:29 8:11 7:3 8:11 7:3 8:9 7:31 8:9 7:32 8:8 7:32 8:6 7:34 8:6 7: 8:4 7: 8:2 7:39 8: 7:42 7:57 8,41,67,26 2 March April May June :52 :12 : : : : 5 9 11 13 15 14 11 5 2,5,,21 5: 5: : :1 :2 :2 :3 :4 :5 :6 :7 :8 :9 :9 :1 :11 :12 :13 :13 5: :14 5: :15 :15 : : : : : : : : : :21 :21 :22 :22 :22 :22 :23 :23 :23 :23 :23 5: :23 5: :24 5: :24 :24 :23 45 un rise (hh:mm) un set (hh:mm) Minutes with flicker First time (hh:mm) with flicker Last time (hh:mm) with flicker 3.1.6 by EMD International A/, Tel. +45 96 35 44 44, www.emd.dk, windpro@emd.dk (WTG causing flicker first time) (WTG causing flicker last time) 15-7- 15:46 / 6

HADOW - Calendar hadow receptor: D - hadow Receptor: Azimuth:, lope: 9, E EE E EE E W WW W WW W um July 2 3 4 5 6 7 8 9 1 11 12 13 14 15 21 22 23 24 25 26 27 28 29 3 31 Potential sun hours Total, worst case un reduction Oper. time red. Wind dir. red. Total reduction Total, real :23 :23 :23 :23 :23 :23 :22 :22 :22 :21 :21 : : : : : : : : : :15 5: :14 5: :13 :13 :12 :11 :1 :9 :8 :7 :6 August eptember :5 :4 :3 :2 :1 : 6 12 14 68,71,,29 :55 : 15 13 11 9 6 5 17,63,,26 28 October ovember : : :14 :51 8 22 26 29 33 34 38 39 4 42 42 8: 8:25 8:12 8:29 8:9 8:31 8:7 8:33 8:5 8:34 8:3 8: 7: 7:38 7:39 7:39 7:39 7:41 7:41 46,52,67,34 139 :31 :31 :3 :29 :28 :28 :27 :27 :26 :26 :25 :25 :24 :24 :23 44 42 42 4 4 39 35 33 31 29 26 23 1 759,45,67,29 222 December 7:41 7:41 7:42 7:41 7:41 7:41 7:41 7:41 7:4 7:4 7:4 7:39 7:39 7:38 7:38 7: 7: 7:34 7:34 7:32 7:14 7:3 7: 7:27 :23 :23 :23 :22 :22 :22 :22 :22 :22 :22 :22 :22 :22 :23 :23 :23 :23 :24 :24 :25 :25 :25 :26 :26 :27 :28 :28 :29 :3 :3 :31 29 un rise (hh:mm) un set (hh:mm) Minutes with flicker First time (hh:mm) with flicker Last time (hh:mm) with flicker 3.1.6 by EMD International A/, Tel. +45 96 35 44 44, www.emd.dk, windpro@emd.dk (WTG causing flicker first time) (WTG causing flicker last time) 15-7- 15:46 / 7

HADOW - Calendar hadow receptor: E - hadow Receptor: Azimuth:, lope: 9, E EE E EE E W WW W WW W um January 2 3 4 5 6 7 8 9 1 11 12 13 14 15 21 22 23 24 25 26 27 28 29 3 31 Potential sun hours Total, worst case un reduction Oper. time red. Wind dir. red. Total reduction Total, real :4 February 48 46 46 46 45 45 42 41 39 38 34 32 29 27 23 7:53 8:4 7:54 8:41 7:54 8:41 7:55 8:42 7:55 8:42 7:55 8:42 7:55 8:42 7:56 8: 7:56 8:44 7:57 8:44 7:57 8:44 7:57 8:44 7:58 8:45 7:58 8:45 7:59 8:45 7:59 8:45 8: 8:46 8: 8:45 8:1 8:46 8:2 8:45 8:2 8:45 8:3 8:45 8:4 8:45 8:5 8:44 8:6 8:44 8:7 8: 8:8 8:42 8:9 8:41 8:11 8:4 8:12 8:39 8:14 8: 1314,39,74,28 5 :15 :27 11 8: 8:35 8: 8:31 29,41,74,29 8 March April :52 :12 3 8 11 13 35,44,45, 7 : : : : 14 9,5,45,22 38 May June 5: 5: : :1 :2 :2 :3 :4 :5 :6 :7 :8 :9 :9 :1 :11 :12 :13 :13 5: :14 5: :15 :15 : : : : : : : : : :21 :21 :22 :22 :22 :22 :23 :23 :23 :23 :23 5: :23 5: :24 5: :24 :24 :23 45 un rise (hh:mm) un set (hh:mm) Minutes with flicker First time (hh:mm) with flicker Last time (hh:mm) with flicker 3.1.6 by EMD International A/, Tel. +45 96 35 44 44, www.emd.dk, windpro@emd.dk (WTG causing flicker first time) (WTG causing flicker last time) 15-7- 15:46 / 8

HADOW - Calendar hadow receptor: E - hadow Receptor: Azimuth:, lope: 9, E EE E EE E W WW W WW W um July 2 3 4 5 6 7 8 9 1 11 12 13 14 15 21 22 23 24 25 26 27 28 29 3 31 Potential sun hours Total, worst case un reduction Oper. time red. Wind dir. red. Total reduction Total, real :23 :23 :23 :23 :23 :23 :22 :22 :22 :21 :21 : : : : : : : : : :15 5: :14 5: :13 :12 :12 :11 :1 :9 :8 :7 :6 August eptember October ovember December :5 :4 :3 :2 :1 : :55 : 9 14 14 11 8 4 5 8,63,45,28 58 : : :14 :51 :31 :31 :3 :29 :28 :28 :27 :27 :26 :26 :25 :25 :24 :24 :23 11 23 27 3 32 34 38 39 41 42 45 45 46 46 46 7:51 8:2 7: 8:6 7:46 8:9 7:44 8:11 7:42 8:12 7:41 8:13 7:41 8:15 7:4 8: 7:39 8: 7:39 8: 7:39 8: 7:38 8: 7:38 8:21 7:38 8:21 7: 8:22 7:38 8:23 7:38 8:24 7:38 8:24 7:38 8:24 7:38 8:25 7:38 8:25 7:39 8:26 827,45,74,32 266 :23 :23 :23 :22 :22 :22 :22 :22 :22 :22 :22 :22 :22 :23 :23 :23 :23 :24 :24 :24 :25 :25 :26 :26 :27 :28 :28 :29 :3 :3 :31 29 48 46 46 46 46 46 46 46 46 46 46 46 46 46 7:39 8:26 7:39 8:26 7:39 8:27 7:4 8:27 7:4 8:27 7:41 8:28 7:41 8:28 7:42 8:29 7:42 8:29 7: 8:3 7: 8:3 7:44 8:31 7:44 8:31 7:45 8:31 7:45 8:32 7:46 8:33 7:46 8:32 7: 8:33 7: 8:33 7:48 8:34 7:48 8:34 7:49 8:35 7:49 8:35 7:5 8: 7:5 8: 7:5 8: 7:51 8:38 7:51 8:38 7:52 8:38 7:52 8:38 7:52 8:39 1445,39,74,28 47 un rise (hh:mm) un set (hh:mm) Minutes with flicker First time (hh:mm) with flicker Last time (hh:mm) with flicker 3.1.6 by EMD International A/, Tel. +45 96 35 44 44, www.emd.dk, windpro@emd.dk (WTG causing flicker first time) (WTG causing flicker last time) 15-7- 15:46 / 9

HADOW - Calendar hadow receptor: F - hadow Receptor: Azimuth:, lope: 9, E EE E EE E W WW W WW W um January February March 2 3 4 5 6 7 8 9 1 11 12 13 14 15 21 22 23 24 25 26 27 28 29 3 31 Potential sun hours Total, worst case un reduction Oper. time red. Wind dir. red. Total reduction Total, real :3 :15 :27 :52 :12 9 13 21 22 24 25 24 24 23 21 15 1 283,44,53,22 63 April May June July August eptember October : : : : 5: 5: : :1 :2 :2 :3 :4 :5 :6 :7 :8 :9 :9 :1 :11 :12 :13 :13 5: :14 5: :15 :15 : : : : : : : : : :21 :21 :22 :22 :22 :22 :23 :23 :23 :23 :23 5: :23 5: :24 5: :24 :24 :23 45 :23 :23 :23 :23 :23 :23 :22 :22 :22 :21 :21 : : : : : : : : : :15 5: :14 5: :13 :12 :12 :11 :1 :9 :8 :7 :6 :5 :4 :3 :2 : : :55 : 7 14 22 23 24 5 127,63,53,32 41 7: 7:24 7:27 7:28 7:29 7:3 7:3 7:3 : : :13 :51 ovemberdecember 24 25 23 21 15 11 7 7:3 7:3 7:29 7:28 7:27 7:26 7:25 7:22 7: 2,52,53,27 :31 :31 :3 :29 :28 :28 :27 :27 :26 :26 :25 :25 :24 :24 :23 :23 :23 :23 :22 :22 :22 :22 :22 :22 :22 :22 :22 :22 :23 :23 :23 :23 :24 :24 :24 :25 :25 :26 :26 :27 :28 :28 :29 :3 :3 :31 29 un rise (hh:mm) un set (hh:mm) Minutes with flicker First time (hh:mm) with flicker Last time (hh:mm) with flicker 3.1.6 by EMD International A/, Tel. +45 96 35 44 44, www.emd.dk, windpro@emd.dk (WTG causing flicker first time) (WTG causing flicker last time) 15-7- 15:46 / 1

HADOW - Calendar hadow receptor: G - hadow Receptor: Azimuth:, lope: 9, E EE E EE E W WW W WW W um January February March 2 3 4 5 6 7 8 9 1 11 12 13 14 15 21 22 23 24 25 26 27 28 29 3 31 Potential sun hours Total, worst case un reduction Oper. time red. Wind dir. red. Total reduction Total, real :3 :15 :27 April :51 :12 15 25 28 31 33 35 38 38 39 38 38 34 33 31 622,44,51,22 134 7: 7:51 7: 7:5 7: 7:48 : : : : 29 26 23 1 5 8 1 12 14 15 15 11 6 291,5,,21 6 7: 7: 7: 7:45 7: 7: 7:23 7:41 7:26 7: May June July August eptember October 5: 5: : :1 :2 :2 :3 :4 :5 :6 :7 :8 :9 :9 :1 :11 :12 :13 :13 5: :14 5: :15 :15 : : : : : : : : : :21 :21 :22 :22 :22 :22 :23 :23 :23 :23 :23 5: :23 5: :23 5: :24 :24 :23 45 :23 :23 :23 :23 :23 :23 :22 :22 :22 :21 :21 : : : : : : : : : :15 5: :14 5: :13 :12 :12 :11 :1 :9 :8 :7 :6 :5 :4 :3 :2 : : 7 12 15 15 14 12 1 8 4 4,71,38,26 :54 : 1 23 26 28 31 33 35 38 38 38 38 35 34 31 29 26 23 5 7,63,51,31 23 7:21 7:31 7: 7:35 7:14 7: 7:38 7:39 7:4 7:41 7:42 7:42 7:42 7:42 7:42 7:41 7:4 7:4 7:39 7:39 7:38 7: 7:35 7:34 7:32 7:3 7:27 : : :13 :51 ovemberdecember 9 9,52,51,26 2 7:22 :31 :31 :3 :29 :28 :28 :27 :27 :26 :25 :25 :25 :24 :24 :23 :23 :23 :23 :22 :22 :22 :22 :22 :22 :22 :22 :22 :22 :23 :23 :23 :23 :24 :24 :24 :25 :25 :26 :26 :27 :28 :28 :29 :3 :3 :31 29 un rise (hh:mm) un set (hh:mm) Minutes with flicker First time (hh:mm) with flicker Last time (hh:mm) with flicker 3.1.6 by EMD International A/, Tel. +45 96 35 44 44, www.emd.dk, windpro@emd.dk (WTG causing flicker first time) (WTG causing flicker last time) 15-7- 15:46 / 11

HADOW - Calendar hadow receptor: H - hadow Receptor: Azimuth:, lope: 9, E EE E EE E W WW W WW W um January February 2 3 4 5 6 7 8 9 1 11 12 13 14 15 21 22 23 24 25 26 27 28 29 3 31 Potential sun hours Total, worst case un reduction Oper. time red. Wind dir. red. Total reduction Total, real :51 :3 :14 :27 March 4 8 12 24,41,55,21 5 :51 :12 April 14 21 21 14 1 1 22 24 26 27 27 28 389,44,51,22 84 : : : : : : : : 27 27 26 25 23 22 15 8 : : : : :45 : :45 : :22 :27 :35 2,5,48,23 44 May June July August eptember October 5: 5: : :1 :2 :2 :3 :4 :5 :6 :7 :8 :9 :9 :1 :11 :12 :13 :13 5: :14 5: :15 :15 : : : : : : : : : :21 :21 :22 :22 :22 :22 :23 :23 :23 :23 :23 5: :23 5: :24 5: :24 :24 :23 45 :23 :23 :23 :23 :23 :23 :22 :22 :22 :21 :21 : : : : : : : : : :15 5: :14 5: :13 :12 :12 :11 :1 :9 :8 :7 :6 :5 :4 :3 :2 : : :54 : 8 15 22 23 25 26 27 27 28 28 27 26 24 22 11 5 394,63,48,29 115 : :35 : : :14 :13 :11 :11 :11 :11 : : :13 :14 :3 : :27 : : :13 :51 ovemberdecember 6 13 21 21 22 15 13 1 7 1 2,52,55,28 61 7:21 7:27 7: 7:3 7:15 7:31 7:14 7:32 7:33 7:33 7:33 7:32 7:14 7:33 7:15 7:32 7: 7:31 7: 7:3 7: 7:28 7: 7:26 7: 7:21 :31 :31 :3 :29 :28 :28 :27 :27 :26 :25 :25 :25 :24 :24 :23 :23 :23 :23 :22 :22 :22 :22 :22 :22 :22 :22 :22 :22 :23 :23 :23 :23 :24 :24 :24 :25 :25 :26 :26 :27 :28 :28 :29 :3 :3 :31 29 un rise (hh:mm) un set (hh:mm) Minutes with flicker First time (hh:mm) with flicker Last time (hh:mm) with flicker 3.1.6 by EMD International A/, Tel. +45 96 35 44 44, www.emd.dk, windpro@emd.dk (WTG causing flicker first time) (WTG causing flicker last time) 15-7- 15:46 / 12

HADOW - Calendar hadow receptor: I - hadow Receptor: Azimuth:, lope: 9, (9) E EE E EE E W WW W WW W um January February 2 3 4 5 6 7 8 9 1 11 12 13 14 15 21 22 23 24 25 26 27 28 29 3 31 Potential sun hours Total, worst case un reduction Oper. time red. Wind dir. red. Total reduction Total, real :51 :3 :14 :27 2 7 1 12 14 21 21 13 8 7:15 7: 7: 7: 7: 7: 7: 7: 7: 7: 7: 7: 7:15 214,41,6,23 5 March April May June July August eptember October :51 :12 8 15 22 24 26 26 27 28 27 27 26 25 23 21 14 4 9,44,4, 63 :4 :26 :26 :58 :26 :26 :58 :58 :3 : : : : 5: 5: : :1 :2 :2 :3 :4 :5 :6 :7 :8 :9 :9 :1 :11 :12 :13 :13 5: :14 5: :15 :15 : : : : : : : : : :21 :21 :22 :22 :22 :22 :23 :23 :23 :23 :23 5: :23 5: :24 5: :24 :24 :23 45 :23 :23 :23 :23 :23 :23 :22 :22 :22 :21 :21 : : : : : : : : : :15 5: :14 5: :13 :12 :12 :11 :1 :9 :8 :7 :6 :5 :4 :3 :2 : : :54 : 11 23 24 26 27 5 1,63,4,24 :41 : : :13 :51 ovember 28 27 28 27 26 24 23 13 3 11 14 21 14 12 9 6 452,52,49,25 113 7:34 7:45 7:33 7: 7:31 7:48 7:3 7:49 7:29 7:49 7:28 7:49 7:29 7:49 :31 :31 :3 :29 :28 :28 :27 :27 :26 :25 :25 :25 :24 :24 :23 December 1 1,45,6,26 :23 :23 :23 :22 :22 :22 :22 :22 :22 :22 :22 :22 :22 :23 :23 :23 :23 :24 :24 :24 :25 :25 :26 :26 :27 :28 :28 :29 :3 :3 :31 29 un rise (hh:mm) un set (hh:mm) Minutes with flicker First time (hh:mm) with flicker Last time (hh:mm) with flicker 3.1.6 by EMD International A/, Tel. +45 96 35 44 44, www.emd.dk, windpro@emd.dk (WTG causing flicker first time) (WTG causing flicker last time) 15-7- 15:46 / 13

HADOW - Calendar hadow receptor: L - hadow Receptor: Azimuth:, lope: 9, (1) E EE E EE E W WW W WW W um January 2 3 4 5 6 7 8 9 1 11 12 13 14 15 21 22 23 24 25 26 27 28 29 3 31 Potential sun hours Total, worst case un reduction Oper. time red. Wind dir. red. Total reduction Total, real :51 :3 February 13 23 26 29 7: 7:49 7:33 7:52 7:31 7:54 7:29 7:55 7:28 7:57 11,39,66,24 27 :14 :27 31 34 39 39 41 42 42 44 42 41 41 39 38 35 34 31 27 24 11 7:27 7:58 7:26 8: 7:25 8:1 7:25 8:2 7:24 8:3 7:24 8:3 7:23 8:4 7:23 8:5 7:23 8:5 7:22 8:5 7:22 8:5 7:22 8:6 7:23 8:6 7:22 8:5 7:22 8:5 7:23 8:5 7:23 8:4 7:23 8:4 7:24 8:3 7:24 8:2 7:26 8:1 7:26 8: 7:28 7:59 7:3 7:57 7:31 7:55 7:34 7:52 7: 7:48 981,41,66,25 249 March April May June :51 : : : : 5: 5: : :1 :2 :2 :3 :4 :5 :6 :7 :8 :9 :9 :1 :11 :12 :13 :13 5: :14 5: :15 :15 : : : : : : : : : :21 :21 :21 :22 :22 :22 :23 :23 :23 :23 :23 5: :23 5: :23 5: :23 :23 :23 7 9 11 11 12 13 14 15 45 449,65,67,41 6 un rise (hh:mm) un set (hh:mm) Minutes with flicker First time (hh:mm) with flicker Last time (hh:mm) with flicker 3.1.6 by EMD International A/, Tel. +45 96 35 44 44, www.emd.dk, windpro@emd.dk (WTG causing flicker first time) (WTG causing flicker last time) 15-7- 15:46 / 14

HADOW - Calendar hadow receptor: L - hadow Receptor: Azimuth:, lope: 9, (1) E EE E EE E W WW W WW W um July 2 3 4 5 6 7 8 9 1 11 12 13 14 15 21 22 23 24 25 26 27 28 29 3 31 Potential sun hours Total, worst case un reduction Oper. time red. Wind dir. red. Total reduction Total, real :23 :23 :23 :23 :23 :22 :22 :22 :22 :21 :21 : : : : : : : : : :15 5: :14 5: :13 :12 :12 :11 :1 :9 :8 :7 :6 14 13 13 12 11 9 7 4 115,72,67,46 53 August eptember October ovember :5 :4 :3 :2 : : :59 :54 : 5 : : :13 :51 14 21 25 29 32 35 38 39 41 42 42 44 8:8 8:22 8:4 8:25 8:2 8:27 7:59 8:28 7:59 8:31 7:57 8:32 7:56 8:32 7:55 8:33 7:54 8:33 7:53 8:34 7:35 7:35 7:35 7:35 7:35 7:35 7:35 61,52,66,33 :31 :31 :3 :29 :28 :28 :27 :27 :26 :25 :25 :24 :24 :24 :23 42 42 41 39 38 35 33 31 29 26 23 12 488,45,66,28 1 December 7:35 7:34 7:35 7:34 7:33 7:32 7:32 7:31 7:3 7:29 7:29 7:27 7:26 7:23 7:21 :23 :23 :23 :22 :22 :22 :22 :22 :22 :22 :22 :22 :22 :22 :23 :23 :23 :24 :24 :24 :25 :25 :26 :26 :27 :28 :28 :29 :3 :3 :31 29 un rise (hh:mm) un set (hh:mm) Minutes with flicker First time (hh:mm) with flicker Last time (hh:mm) with flicker 3.1.6 by EMD International A/, Tel. +45 96 35 44 44, www.emd.dk, windpro@emd.dk (WTG causing flicker first time) (WTG causing flicker last time) 15-7- 15:46 / 15

HADOW - Calendar hadow receptor: M - hadow Receptor: Azimuth:, lope: 9, (11) E EE E EE E W WW W WW W um January February March 2 3 4 5 6 7 8 9 1 11 12 13 14 15 21 22 23 24 25 26 27 28 29 3 31 Potential sun hours Total, worst case un reduction Oper. time red. Wind dir. red. Total reduction Total, real :4 :15 :27 :52 :12 April May : : : : 9 22 25 29 3 32 34 35 35 35 34 32 31 29 27 711,5,53,25 1 :5 : :54 :3 :59 :3 :27 :2 :2 :24 :24 :24 :24 :24 :59 :59 :57 :27 :55 5: : :1 :2 :2 :3 :4 :5 :6 :7 :8 :9 :9 :1 :11 :12 25 21 12 :3 :32 :35 : 75,58,53,29 22 June July August eptember :13 :13 5: :14 5: :15 5: :15 : : : : : : : : : :21 :21 :21 :22 :22 :22 :23 :23 :23 :23 :23 5: :23 5: :23 5: :23 :23 :23 45 :23 :23 :23 :23 :23 :22 :22 :22 :22 :21 :21 : : : : : : : : : :15 5: :14 5: :13 :12 :12 :11 :1 :9 :8 :7 :6 :5 :4 :3 :2 : : 5 13 22 25 28 3 32 33 35 35 35 34 32 3 29 729,71,53, 26 : :52 :4 :59 : :2 :35 :4 :32 :3 :3 :4 :4 :2 :3 :3 :59 :55 : 25 22 9 October ovemberdecember :32 :57 :55 :35 :52 5 73,63,53,32 23 : : :14 :51 :31 :3 :29 :29 :28 :27 :27 :26 :26 :25 :25 :24 :24 :23 :23 :23 :23 :22 :22 :22 :22 :22 :22 :22 :22 :22 :22 :23 :23 :23 :23 :24 :24 :25 :25 :25 :26 :27 :27 :28 :28 :29 :3 :3 :31 29 un rise (hh:mm) un set (hh:mm) Minutes with flicker First time (hh:mm) with flicker Last time (hh:mm) with flicker 3.1.6 by EMD International A/, Tel. +45 96 35 44 44, www.emd.dk, windpro@emd.dk (WTG causing flicker first time) (WTG causing flicker last time) 15-7- 15:46 /

HADOW - Calendar, graphical WTGs 4: VETA 126.!O! hub: m (TOT:, m) 8: VETA 126.!O! hub: m (TOT:, m) 5: VETA 126.!O! hub: m (TOT:, m) 3.1.6 by EMD International A/, Tel. +45 96 35 44 44, www.emd.dk, windpro@emd.dk 15-7- 15:46 /

HADOW - Calendar, graphical WTGs 1: VETA 126.!O! hub: m (TOT:, m) 7: VETA 126.!O! hub: m (TOT:, m) 5: VETA 126.!O! hub: m (TOT:, m) 8: VETA 126.!O! hub: m (TOT:, m) 6: VETA 126.!O! hub: m (TOT:, m) 3.1.6 by EMD International A/, Tel. +45 96 35 44 44, www.emd.dk, windpro@emd.dk 15-7- 15:46 /

HADOW - Calendar per WTG WTG: 1 - VETA 126.!O! hub: m (TOT:, m) E EE E EE E W WW W WW W um January FebruaryMarch 2 3 4 5 6 7 8 9 1 11 12 13 14 15 21 22 23 24 25 26 27 28 29 3 31 Potential sun hours um of minutes with flicker :58 :4 :15 :27 :33 :41 :52 :12 April May : : : : -:5/9 :-:54/ -/22 -/25 :3-:59/29 :3-/3 -/32 :27-/34 -/35 -:2/ -/ -:2/ :24-/ :24-/ :24-/ :24-/ -/35 :24-:59/35 -:59/34 -/32 -:57/31 :27-/29 -:55/27 711 5: : :1 :2 :2 :3 :4 :5 :6 :7 :8 :9 :9 :1 :11 :12 -/25 :3-/21 :32-/ :35-:/12 75 June July August eptember October ovember December :13 :13 5: :14 5: :15 5: :15 : : : : : : : : : :21 :21 :22 :22 :22 :22 :23 :23 :23 :23 :23 5: :23 5: :24 5: :24 :24 :23 45 :23 :23 :23 :23 :23 :23 :22 :22 :22 :21 :21 : : : : : : : : : :15 5: :14 5: :13 :12 :12 :11 :1 :9 :8 :7 :6 :5 :4 :3 :2 :1 : :-:52/5 -/13 :4-:59/ -/22 :-:2/25 :35-/28 -:4/3 -/32 :32-/33 -/35 -/35 :3-/ :3-/ -/ -/ -/ -/ -:4/ -:4/ -/35 -:2/34 -/32 :3-/3 :3-:59/29 :55 :5 : :32-:57/25 -:55/22 :35-:52/ -/9 5 729 73 :3 : : :14 :51 :31 :3 :29 :29 :28 :27 :27 :26 :26 :25 :25 :24 :24 :23 :23 :23 :23 :22 :22 :22 :22 :22 :22 :22 :22 :22 :22 :23 :23 :23 :23 :24 :24 :25 :25 :25 :26 :27 :27 :28 :28 :29 :3 :31 :31 29 un rise (hh:mm) un set (hh:mm) 3.1.6 by EMD International A/, Tel. +45 96 35 44 44, www.emd.dk, windpro@emd.dk 15-7- 15:46 /

HADOW - Calendar per WTG WTG: 2 - VETA 126.!O! hub: m (TOT:, m) (2) E EE E EE E W WW W WW W um January FebruaryMarch 2 3 4 5 6 7 8 9 1 11 12 13 14 15 21 22 23 24 25 26 27 28 29 3 31 Potential sun hours um of minutes with flicker :4 :15 :27 :52 :12 April May June July August eptember October ovember December : : : : 5: : :1 :2 :2 :3 :4 :5 :6 :7 :8 :9 :9 :1 :11 :12 :13 :13 5: :14 5: :15 5: :15 : : : : : : : : : :21 :21 :22 :22 :22 :22 :23 :23 :23 :23 :23 5: :23 5: :24 5: :24 :24 :23 45 :23 :23 :23 :23 :23 :23 :22 :22 :22 :21 :21 : : : : : : : : : :15 5: :14 5: :13 :12 :12 :11 :1 :9 :8 :7 :6 :5 :4 :3 :2 :1 : :55 : 5 :3 : : :14 :51 :31 :3 :29 :29 :28 :27 :27 :26 :26 :25 :25 :24 :24 :23 :23 :23 :23 :22 :22 :22 :22 :22 :22 :22 :22 :22 :22 :23 :23 :23 :23 :24 :24 :25 :25 :25 :26 :27 :27 :28 :28 :29 :3 :3 :31 29 un rise (hh:mm) un set (hh:mm) 3.1.6 by EMD International A/, Tel. +45 96 35 44 44, www.emd.dk, windpro@emd.dk 15-7- 15:46 /

HADOW - Calendar per WTG WTG: 3 - VETA 126.!O! hub: m (TOT:, m) (3) E EE E EE E W WW W WW W um January FebruaryMarch 2 3 4 5 6 7 8 9 1 11 12 13 14 15 21 22 23 24 25 26 27 28 29 3 31 Potential sun hours um of minutes with flicker :4 :15 :27 :52 :12 April May June July August eptember October ovember December : : : : 5: 5: : :1 :2 :2 :3 :4 :5 :6 :7 :8 :9 :9 :1 :11 :12 :13 :13 5: :14 5: :15 5: :15 : : : : : : : : : :21 :21 :22 :22 :22 :22 :23 :23 :23 :23 :23 5: :23 5: :23 5: :24 :24 :23 45 :23 :23 :23 :23 :23 :23 :22 :22 :22 :21 :21 : : : : : : : : : :15 5: :14 5: :13 :12 :12 :11 :1 :9 :8 :7 :6 :5 :4 :3 :2 : : :55 : 5 : : :14 :51 :31 :31 :3 :29 :29 :28 :27 :27 :26 :26 :25 :25 :24 :24 :23 :23 :23 :23 :22 :22 :22 :22 :22 :22 :22 :22 :22 :22 :23 :23 :23 :23 :24 :24 :25 :25 :25 :26 :26 :27 :28 :28 :29 :3 :3 :31 29 un rise (hh:mm) un set (hh:mm) 3.1.6 by EMD International A/, Tel. +45 96 35 44 44, www.emd.dk, windpro@emd.dk 15-7- 15:46 / 21

HADOW - Calendar per WTG WTG: 4 - VETA 126.!O! hub: m (TOT:, m) E EE E EE E W WW W WW W um January 2 3 4 5 6 7 8 9 1 11 12 13 14 15 21 22 23 24 25 26 27 28 29 3 31 Potential sun hours um of minutes with flicker :3 February 7:53-8:4/ 7:54-8:41/ 7:54-8:41/ 7:55-8:42/ 7:55-8:42/ 7:55-8:42/ 7:55-8:42/ 7:56-8:/ 7:56-8:44/48 7:57-8:44/ 7:57-8:44/ 7:57-8:44/ 7:58-8:45/ 7:58-8:45/ 7:59-8:45/46 7:59-8:45/46 8:-8:46/46 8:-8:45/45 8:1-8:46/45 8:2-8:45/ 7:42-7:51/9 8:2-8:45/ 7:38-7:54/ 8:3-8:45/42 7:-7:57/ 8:4-8:45/41 7:-7:59/23 8:5-8:44/39 7:34-8:/26 8:6-8:44/38 7:34-8:3/29 8:7-8:/ 7:33-8:4/31 8:8-8:42/34 7:32-8:5/33 8:9-8:41/32 7:31-8:6/35 8:11-8:4/29 7:3-8:7/ 8:12-8:39/27 7:3-8:7/ 8:14-8:/23 7:29-8:8/39 49 :15 :27 8:-8:35/ 7:29-8:9/4 8:-8:31/11 7:29-8:9/4 7:28-8:1/42 7:28-8:1/42 7:28-8:11/ 7:28-8:11/ 7:28-8:12/44 7:29-8:12/ 7:29-8:12/ 7:28-8:11/ 7:29-8:11/42 7:29-8:11/42 7:3-8:11/41 7:3-8:9/39 7:31-8:9/38 7:32-8:8/ 7:32-8:6/34 7:34-8:6/32 7:-8:4/28 7:-8:2/25 7:39-8:/21 7:42-7:57/15 845 March April May June July August eptember October ovember :52 :12 : : : : 5: 5: : :1 :2 :2 :3 :4 :5 :6 :7 :8 :9 :9 :1 :11 :12 :13 :13 5: :14 5: :15 :15 : : : : : : : : : :21 :21 :22 :22 :22 :22 :23 :23 :23 :23 :23 5: :23 5: :23 5: :24 :23 :23 45 :23 :23 :23 :23 :23 :22 :22 :22 :22 :21 :21 : : : : : : : : : :15 5: :14 5: :13 :12 :12 :11 :1 :9 :8 :7 :6 :5 :4 :3 :2 : : :54 : 5 : : :13 :51 8:-8:25/8 8:12-8:29/ 8:9-8:31/22 8:7-8:33/26 8:5-8:34/29 8:3-8:/33-7:/34-7:38/ -7:39/38-7:39/39-7:39/4-7:41/42-7:41/42 46 :31 :31 :3 :29 :28 :28 :27 :27 :26 :26 :25 :25 :24 :24 :23 December -7:41/ -7:41/ -7:42/44-7:41/ -7:41/ -7:41/ -7:41/42-7:41/42 7:51-8:2/11-7:4/4 7:-8:6/ -7:4/4 7:46-8:9/23-7:4/39 7:44-8:11/27-7:39/ 7:42-8:12/3-7:39/ 7:41-8:13/32-7:38/35 7:41-8:15/34-7:38/33 7:4-8:/ -7:/31 7:39-8:/38-7:/29 7:39-8:/39-7:34/26 7:39-8:/41-7:34/23 7:38-8:/42-7:32/ 7:38-8:21/ 7:14-7:3/ 7:38-8:21/ 7:-7:27/1 7:-8:22/45 7:38-8:23/45 7:38-8:24/46 7:38-8:24/46 7:38-8:24/46 7:38-8:25/ 7:38-8:25/ 7:39-8:26/ 1586 :23 :23 :23 :22 :22 :22 :22 :22 :22 :22 :22 :22 :22 :23 :23 :23 :23 :24 :24 :24 :25 :25 :26 :26 :27 :28 :28 :29 :3 :3 :31 29 7:39-8:26/ 7:39-8:26/ 7:39-8:27/48 7:4-8:27/ 7:4-8:27/ 7:41-8:28/ 7:41-8:28/ 7:42-8:29/ 7:42-8:29/ 7:-8:3/ 7:-8:3/ 7:44-8:31/ 7:44-8:31/ 7:45-8:31/46 7:45-8:32/ 7:46-8:33/ 7:46-8:32/46 7:-8:33/46 7:-8:33/46 7:48-8:34/46 7:48-8:34/46 7:49-8:35/46 7:49-8:35/46 7:5-8:/46 7:5-8:/46 7:5-8:/46 7:51-8:38/ 7:51-8:38/ 7:52-8:38/46 7:52-8:38/46 7:52-8:39/ 1445 un rise (hh:mm) un set (hh:mm) 3.1.6 by EMD International A/, Tel. +45 96 35 44 44, www.emd.dk, windpro@emd.dk 15-7- 15:46 / 22

HADOW - Calendar per WTG WTG: 5 - VETA 126.!O! hub: m (TOT:, m) E EE E EE E W WW W WW W um January FebruaryMarch 2 3 4 5 6 7 8 9 1 11 12 13 14 15 21 22 23 24 25 26 27 28 29 3 31 Potential sun hours um of minutes with flicker :51 :3 :14 :27 :51 April -/9 -/13 -/ -/ -/21 -/22 -/24 -/25 -/24 -/24 -/25 -/28 -/31 -/33 -/35 -/ -/ -/38 -/38 -/39 -/38 -/38 -/ -/ -/3 7:-7:51/34 -/8 7:-7:5/33 -/11 7:-7:48/31 -/13 8 : : : : 7:-7:/29 -/ 7:-7:45/26 -/ 7:-7:/23 -/ 7:23-7:41/ -/ 7:26-7:/1 -/21 -/22 -/23 -/23 -/23 -/22 -/ -/ -/ -/14 -/11 -/5 397 May June July August eptember 5: 5: : :1 :2 :2 :3 :4 :5 :6 :7 :8 :9 :9 :1 :11 :12 :13 :13 5: :14 5: :15 :15 : : : : : : : : : :21 :21 :21 :22 :22 :22 :23 :23 :23 :23 :23 5: :23 5: :23 5: :23 :23 :23 45 :23 :23 :23 :23 :23 :22 :22 :22 :22 :21 :21 : : : : : : : : : :15 5: :14 5: :13 :12 :12 :11 :1 :9 :8 :7 :6 :5 :4 :3 :2 : : -/6 -/12 -/14 -/ -/ 68 :59 :54 : 5 October -/ -/22 -/23 -/23 -/23 -/22 7:21-7:31/1 -/21 7:-7:35/ -/ 7:14-7:/23 -/ -7:38/26 -/ -7:39/28 -/ -7:4/31 -/14-7:41/33 -/11-7:42/35 -/8-7:42/ -/4-7:42/ -7:42/ -7:42/38-7:41/38-7:4/38-7:4/38-7:39/ -7:39/ -7:38/35-7:/34-7:35/31-7:34/29-7:32/26-7:3/23-7:3/24 15 : : :13 :51 ovember December -7:3/24-7:3/25-7:29/23-7:28/21-7:27/ -7:26/ -7:25/15-7:22/11-7:/7 2 :31 :31 :3 :29 :28 :28 :27 :27 :26 :25 :25 :25 :24 :24 :23 :23 :23 :23 :22 :22 :22 :22 :22 :22 :22 :22 :22 :22 :23 :23 :23 :23 :24 :24 :24 :25 :25 :26 :26 :27 :28 :28 :29 :3 :3 :31 29 un rise (hh:mm) un set (hh:mm) 3.1.6 by EMD International A/, Tel. +45 96 35 44 44, www.emd.dk, windpro@emd.dk 15-7- 15:46 / 23

HADOW - Calendar per WTG WTG: 6 - VETA 126.!O! hub: m (TOT:, m) E EE E EE E W WW W WW W um January 2 3 4 5 6 7 8 9 1 11 12 13 14 15 21 22 23 24 25 26 27 28 29 3 31 Potential sun hours um of minutes with flicker :51 :3 February 7:-7:49/13 7:33-7:52/ 7:31-7:54/23 7:29-7:55/26 7:28-7:57/29 11 :14 :26 March 7:27-7:58/31 7:26-8:/34 7:25-8:1/ 7:25-8:2/ 7:24-8:3/39 7:24-8:3/39 7:23-8:4/41 7:23-8:5/42 7:23-8:5/42 7:22-8:5/ -/2 7:22-8:5/ -7:15/7 7:22-8:6/44-7:/1 7:23-8:6/ -7:/12 7:22-8:5/ -7:/14 7:22-8:5/ -7:/ 7:23-8:5/42-7:/ 7:23-8:4/41-7:/ 7:23-8:4/41-7:/21 7:24-8:3/39-7:/21 7:24-8:2/38-7:/ 7:26-8:1/35-7:/ 7:26-8:/34-7:/ 7:28-7:59/31-7:15/13 7:3-7:57/27 -/8 7:31-7:55/24 7:34-7:52/ -/4 7:-7:48/11 -/8 -/12 12 :51 April -/14 -/ -/ -/ -/21 -/21 -/ -/ -/ -/14 -/1 :12 : : : : -/5 -/8 -/1 -/12 -/14 -/15 -/ -/ -/ -/ -/ -/15 -/11 -/6 5 May June 5: 5: : :1 :1 :2 :3 :4 :5 :6 :7 :8 :9 :9 :1 :11 :12 :12 :13 5: :14 5: :15 :15 : : : : : : : : : :21 :21 :21 :22 :22 :22 :23 :23 :23 :23 :23 5: :23 5: :23 5: :23 :23 :23 45 un rise (hh:mm) un set (hh:mm) 3.1.6 by EMD International A/, Tel. +45 96 35 44 44, www.emd.dk, windpro@emd.dk 15-7- 15:46 / 24

HADOW - Calendar per WTG WTG: 6 - VETA 126.!O! hub: m (TOT:, m) E EE E EE E W WW W WW W um July 2 3 4 5 6 7 8 9 1 11 12 13 14 15 21 22 23 24 25 26 27 28 29 3 31 Potential sun hours um of minutes with flicker :23 :23 :23 :23 :23 :22 :22 :22 :22 :21 :21 : : : : : : : : : :15 5: :14 5: :13 :12 :12 :11 :1 :9 :8 :7 :6 August eptember October ovember :5 :4 :3 :2 : : -/7 -/12 -/15 -/ -/ -/ -/ -/ -/15 -/14 -/12 -/1 -/8 -/4 4 :4 :59 :54 : 5 :24 : : :13 :51 7:21-7:27/6 7:-7:3/13 7:15-7:31/ 7:14-7:32/ -7:33/21-7:33/21-7:33/22-7:32/ 7:14-7:33/ 7:15-7:32/ 7:-7:31/15 7:-7:3/13 7:-7:28/1 8:8-8:22/14 7:-7:26/7 8:4-8:25/21 7:-7:21/1 8:2-8:27/25 7:59-8:28/29 7:34-7:45/11 7:59-8:31/32 7:33-7:/14 7:57-8:32/35 7:31-7:48/ 7:56-8:32/ 7:3-7:49/ 7:55-8:33/38 7:29-7:49/ 7:54-8:33/39 7:28-7:49/21 7:53-8:34/41 7:29-7:49/ -7:35/42 -/ -7:35/42 -/ -7:35/ -/ -7:35/ -/14-7:35/44 -/12-7:35/ -/9-7:35/ -/6 144 :31 :31 :3 :29 :28 :28 :27 :26 :26 :25 :25 :24 :24 :24 :23 December -7:35/ -/1 :23-7:34/42 :23-7:35/42 :23-7:34/41 :22-7:33/39 :22-7:32/38 :22-7:32/ :22-7:31/35 :22-7:3/33 :22-7:29/31 :22-7:29/29 :22-7:27/26 :22-7:26/23 :22-7:23/ :22-7:21/12 :23 :23 :23 :24 :24 :24 :25 :25 :26 :26 :27 :28 :28 :29 :3 :3 :31 29 489 un rise (hh:mm) un set (hh:mm) 3.1.6 by EMD International A/, Tel. +45 96 35 44 44, www.emd.dk, windpro@emd.dk 15-7- 15:46 / 25

HADOW - Calendar per WTG WTG: 7 - VETA 126.!O! hub: m (TOT:, m) E EE E EE E W WW W WW W um January FebruaryMarch 2 3 4 5 6 7 8 9 1 11 12 13 14 15 21 22 23 24 25 26 27 28 29 3 31 Potential sun hours um of minutes with flicker :4 :15 :27 :52 :12 April -/8 -/15 :4-/ -/22 -/24 -:26/26 -/26 -:26/27 :58-:26/28 -:26/27 :58-/27 :58-/26 -/25 -/23 -/21 -/ :3-/14 -/4 -/1 -/ -/ -/22 -/24 -/26 -/27 :-:/27 :-:/28 578 : : : : :-:/27 :-/27 :-:45/26 :-:45/25 :-/23 -/22 :22-/ -/15 :27-:35/8 May June July August eptember October ovember December 5: 5: : :1 :2 :3 :3 :4 :5 :6 :7 :8 :9 :9 :1 :11 :12 2 :13 :13 5: :14 5: :15 :15 : : : : : : : : : :21 :21 :22 :22 :22 :22 :23 :23 :23 :23 :23 5: :23 5: :24 5: :24 :24 :24 45 :23 :23 :23 :23 :23 :23 :22 :22 :22 :21 :21 : : : : : : : : : :15 5: :14 5: :13 :13 :12 :11 :1 :9 :8 :7 :6 :5 :4 :3 :2 :1 : :55 : -/8 :-:35/15 -:/ :-/22 -/23 :14-/25 :13-/26 -/27 -/27 :11-/28 :11-/28 :11-/27 :11-:/26 -:/24 -/22 :13-/ :14-:3/ :-:27/11 -/11 -/ -/ :41-/23 -/24 -/26 -/27 5 541 : : :14 :51 -/28 -/27 -/28 -/27 -/26 -/24 -/23 -/ -/ -/13 -/3 2 :31 :31 :3 :29 :28 :28 :27 :27 :26 :26 :25 :25 :24 :24 :23 :23 :23 :23 :22 :22 :22 :22 :22 :22 :22 :22 :22 :22 :23 :23 :23 :23 :24 :24 :24 :25 :25 :26 :26 :27 :28 :28 :29 :3 :3 :31 29 un rise (hh:mm) un set (hh:mm) 3.1.6 by EMD International A/, Tel. +45 96 35 44 44, www.emd.dk, windpro@emd.dk 15-7- 15:46 / 26

HADOW - Calendar per WTG WTG: 8 - VETA 126.!O! hub: m (TOT:, m) E EE E EE E W WW W WW W um January FebruaryMarch 2 3 4 5 6 7 8 9 1 11 12 13 14 15 21 22 23 24 25 26 27 28 29 3 31 Potential sun hours um of minutes with flicker :51 :3 :15 :27 :52 :12 -/13 -/ -/24 -/27 -/3 -/31 -/33 -/34 -/35 -/ -/ -/ -/ -/ -/35 -/34 -/32 -/31 -/28 -/26 -/22 -/ -/1 663 April May June July : : : : 5: 5: : :1 :2 :3 :3 :4 :5 :6 :7 :8 :9 :9 :1 :11 :12 :13 :13 5: :14 5: :15 :15 : : : : : : : : : :21 :21 :22 :22 :22 :22 :23 :23 :23 :23 :23 5: :23 5: :24 5: :24 :24 :24 -/7 -/9 -/11 -/11 -/12 -/13 -/14 -/15 -/ -/ -/ -/ -/ -/ -/ -/ -/ -/ -/ -/ -/ -/ -/ -/ -/ -/ -/ -/ 451 449 :23 :23 :23 :23 :23 :23 :22 :22 :22 :21 :21 : : : : : : : : : :15 5: :14 5: :13 :13 :12 :11 :1 :9 :8 :7 :6 August -/ -/ -/14 -/13 -/13 -/12 -/11 -/9 -/7 -/4 115 :5 :4 :3 :2 :1 : eptember October :55 : 7:31-7:38/7 7:26-7:42/ 7:22-7:/21 7:-7:45/25 7:-7:46/28 7:-7:/3 7:-7:48/32 7:15-7:48/33 7:14-7:48/34-7:48/35-7:48/ -7:48/ -7:48/ 5 : : :13 :51 ovember December -7:/ -7:/ -7:46/35-7:45/34-7:44/32-7:/31-7:41/28 7:14-7:4/26 7:-7:39/22 7:-7:/ 7:22-7:32/1 37 :31 :31 :3 :29 :28 :28 :27 :27 :26 :25 :25 :25 :24 :24 :23 :23 :23 :23 :22 :22 :22 :22 :22 :22 :22 :22 :22 :22 :23 :23 :23 :23 :24 :24 :24 :25 :25 :26 :26 :27 :28 :28 :29 :3 :3 :31 29 un rise (hh:mm) un set (hh:mm) 3.1.6 by EMD International A/, Tel. +45 96 35 44 44, www.emd.dk, windpro@emd.dk 15-7- 15:46 / 27

HADOW - Calendar per WTG WTG: 9 - VETA 126.!O! hub: m (TOT:, m) (9) E EE E EE E W WW W WW W um January FebruaryMarch 2 3 4 5 6 7 8 9 1 11 12 13 14 15 21 22 23 24 25 26 27 28 29 3 31 Potential sun hours um of minutes with flicker :51 :3 :14 : :26 :41 :51 April May June July August eptember October ovember December : : : : 5: 5: : :1 :2 :2 :3 :4 :5 :6 :7 :8 :9 :9 :1 :11 :12 :13 5: :13 5: :14 5: :15 :15 : : : : : : : : : :21 :21 :22 :22 :22 :22 :23 :23 :23 :23 :23 :23 5: :23 5: :24 :24 :23 451 :23 :23 :23 :23 :23 :22 :22 :22 :22 :21 :21 : : : : : : : : : :15 5: :14 5: :13 :12 :12 :11 :1 :9 :8 :7 :6 :5 :4 :3 :2 : : :4 :59 :54 : 5 :24 : : :13 :51 :31 :31 :3 :29 :28 :28 :27 :26 :26 :25 :25 :24 :24 :24 :23 :23 :23 :22 :22 :22 :22 :22 :22 :22 :22 :22 :22 :22 :22 :23 :23 :23 :24 :24 :24 :25 :25 :26 :26 :27 :28 :28 :29 :3 :3 :31 289 un rise (hh:mm) un set (hh:mm) 3.1.6 by EMD International A/, Tel. +45 96 35 44 44, www.emd.dk, windpro@emd.dk 15-7- 15:46 / 28

HADOW - Calendar per WTG WTG: 1 - VETA 126.!O! hub: m (TOT:, m) (1) E EE E EE E W WW W WW W um January FebruaryMarch 2 3 4 5 6 7 8 9 1 11 12 13 14 15 21 22 23 24 25 26 27 28 29 3 31 Potential sun hours um of minutes with flicker :51 :3 :14 :27 :51 :12 April May June July August eptember October ovember December : : : : 5: 5: : :1 :2 :3 :3 :4 :5 :6 :7 :8 :9 :9 :1 :11 :12 :13 :13 5: :14 5: :15 :15 : : : : : : : : : :21 :21 :22 :22 :22 :23 :23 :23 :23 :23 :23 5: :24 5: :24 5: :24 :24 :24 451 :23 :23 :23 :23 :23 :23 :22 :22 :22 :21 :21 : : : : : : : : : :15 5: :14 5: :13 :13 :12 :11 :1 :9 :8 :7 :6 :5 :4 :3 :2 :1 : :54 : 5 : : :13 :51 :31 :31 :3 :29 :28 :28 :27 :27 :26 :25 :25 :24 :24 :24 :23 :23 :23 :23 :22 :22 :22 :22 :22 :22 :22 :22 :22 :22 :22 :23 :23 :23 :24 :24 :24 :25 :25 :26 :26 :27 :28 :28 :29 :3 :3 :31 289 un rise (hh:mm) un set (hh:mm) 3.1.6 by EMD International A/, Tel. +45 96 35 44 44, www.emd.dk, windpro@emd.dk 15-7- 15:46 / 29

HADOW - Calendar per WTG, graphical hadow receptors D: hadow Receptor: Azimuth:, lope: 9, H: hadow Receptor: Azimuth:, lope: 9, E: hadow Receptor: Azimuth:, lope: 9, I: hadow Receptor: Azimuth:, lope: 9, (9) F: hadow Receptor: Azimuth:, lope: 9, L: hadow Receptor: Azimuth:, lope: 9, (1) G: hadow Receptor: Azimuth:, lope: 9, M: hadow Receptor: Azimuth:, lope: 9, (11) 3.1.6 by EMD International A/, Tel. +45 96 35 44 44, www.emd.dk, windpro@emd.dk 15-7- 15:46 / 3

HADOW - Calendar per WTG, graphical hadow receptors A: hadow Receptor: Azimuth:, lope: 9, I: hadow Receptor: Azimuth:, lope: 9, (9) H: hadow Receptor: Azimuth:, lope: 9, L: hadow Receptor: Azimuth:, lope: 9, (1) 3.1.6 by EMD International A/, Tel. +45 96 35 44 44, www.emd.dk, windpro@emd.dk 15-7- 15:46 / 31

HADOW - Map Hours per year, real case 5 1 5 Hours per year, real case,1-5, 5, - 1, 1, - 25, 25, -, OpentreetMap contributors - www.openstreetmap.org/copyright 5 1 15 m Map: Open treet Map 1, Print scale 1:5., Map center UTM (north)-wg84 Zone: 33 East: 745.98 orth: 4.488.15 ew WTG hadow receptor Flicker map level: Height Contours: COTOURLIE_OLIEDATA_.wpo 3.1.6 by EMD International A/, Tel. +45 96 35 44 44, www.emd.dk, windpro@emd.dk 15-7- 15:46 / 32