Iris and SJU Project P15.2.6 Iris Public Event 04 University of Salzburg Unipark P. Tavernise P15.2.6 PM R
Content Project 15.2.6: Main objective Project 15.2.6: Project in brief Project 15.2.6: Specific objectives Current status: Achievement and progress of project - deliverables Current status: SATCOM Mission Requirement Document Current status: Achievement and progress of project next steps 2
Project 15.2.6: Main objective SESAR P15.2.6 Future Mobile Satellite Communication is the SESAR project interfacing the ESA Iris Programme for all the SATCOM matters 3 Project 15.2.6 Main objective: To develop the requirements for the future Satellite Communication system (inputs for the ESA Iris Programme) and perform complementary activities of validation and support to the ICAO standardization
Project 15.2.6: Project in brief 4 Coordinator: THALES (Thales Alenia Space Italia) Partners: THALES (TAS-F, TAS-E, TCOM), INDRA, FREQUENTIS ALENIA (Telespazio), AIRBUS AENA, NORACON EUROCONTROL Observers: ESA Airspace Users: EBAA, SAS, Air France, Lufthansa Duration: April 2010 to December 2016
Project 15.2.6: Specific objectives 1. Define the SATCOM Mission Requirements in the context of 4D trajectory management 5 2. Define the SATCOM system interfaces with the overall SESAR infrastructure 3. Define the technical validation requirements for the SATCOM solution 4. Support the ESA Iris Programme for executing the technical validation from an end-to-end point of view in collaboration with P15.2.4 for the Future Communication Infrastructure Operational Concept. Operational validation is not included. 5. Support the standardization processes by promoting the SATCOM solution to aviation regional and international standardizations bodies (ICAO, EUROCAE, etc.)
ESA Iris Programme and P15.2.6 links 6
Current status: Achievement and progress of project - deliverables Delivered documents: 7 WA1: SATCOM MRD D101 Satellite System Operational Concept Definition D102 Multi-link Satcom System Requirements Completion D103 SATCOM System Traffic Dimensioning and capacity assessment D105 Safety Requirements D104 SATCOM Mission Requirements document : issue 2.1 delivered to SESAR CBA study and Nexus WG Issue 3.0 delivered to SJU at the end of January 2013 and to be provided to NEXUS WG WA2: SATCOM ICD D109 Interoperability and D110 Spectrum allocation inputs to D111 have been already delivered D111 Iris Interface Control Document definition Issue 1.0 delivered June 2012 Issue 2.0 next draft issue foreseen in March 2013 WA3: SATCOM V&V D112 V&V Test Plan & Test Procedures for V2 : foreseen to be delivered in March 2013 WA4: SATCOM standardization D 121: European and international standardisation bodies focused on the contribution to the international Nexus WG aiming to develop a proposal for updating the current ICAO AMS(R)S SARPs with performance based requirements that will be appropriate for the future applications and services
Current status: SATCOM Mission Requirement Document 8 SATCOM MRD Issue 3.0 submitted to SJU on 29/01/2013 Main improvements wrt previous MRD issue 2.3 are: Overall document structure update Consolidation of Communication Service requirements (including topics like: Multi-link, Data link, Voice, Coverage, Security & Safety, etc) Consolidation of Service Provision requirements (including topics like: Data and Voice capacity, Nominal and Contingencies operations, Lifecycle, Standardization and Certification, Interoperability, etc) Next steps: Consolidation of the Verification and Validation requirements
Current status: Achievement and progress of project next steps Review and update (if necessary) the schedule and planning as appropriate further to the 2012 ESA Ministerial Conference outcomes Considering that P15.2.4 Future Mobile Data Link System Definition is expected to KO within February, to initiate discussions/iterations on the main P15.2.6 assumptions related to the Future Communication Infrastructure and Multi Link Operational Concept Consolidate a second draft of the SATCOM ICD Prepare and deliver to ESA a draft version of the Validation and Verification Test plan and procedure for step V3 * document by July 2013 in order to be used by ESA for the preparation of the ESA Ministerial Conference 2014 9 * Step V3 is indicating in the European Operational Concept Validation Methodology (E-OCVM) a system ready for the industrialization and preoperational phase
P15.2.6 schedule 10 Initiation Phase Execution Phase Name WA0 Program Management WA1 SATCOM Mission Requirements Definition WA2 SATCOM ICD definition WA3 SATCOM V&V WA3.1: V&V step V2 (feasibility) WA3.2: V&V step V3 (pre-industrial developm WA3.3: V&V Support activities FCI - SATCOM WA4 SATCOM Standardization 09 2010 2011 2012 2013 2014 2015 2016 2 T2T3T4T1T2T3T4T1T2T3T4T1T2T3T4T1T2T3T4T1T2T3T4T1T2T3T4T1T2T3T4