1 Concrete structures Case studies PIETRO CROCE Department of Civil and Industrial Engineering Structural division University of Pisa Leonardo da Vinci Assessment of existing structures Project number: CZ/11/LLP-LdV/TOI/134005

2 An existing building requires structural reassessment when: its reliability is inadequate, also due to misuse or human errors; the structure is modified and/or enlarged; the category of use of the structure is improved and/or its design working life is increased; the structure has been damaged or deteriorated by environmental, chemical or biological, attack or by more general time dependent effects; the structure has been damaged by accidental loads, e.g. earthquake or explosion, or by settlements or by other unintentional events like impacts, vibrations, water losses and so on.

3 According to the flow charts reported in section 4, the investigation process involves the acquisition of all relevant information concerning: the original design and structural conception of the building, as well as the reference structural codes, if any; the sequence of structural modifications during its life, addition or demolition of structural parts and/or deep maintenance interventions; actual material properties; actual damage and/or crack patterns; required performance level.

4 CASE STUDY N. 1 STRENGTHENING OF R.C. COLUMNS

5 General view of the building Damaged columns

6 Corroded rebars Cracking of concrete cover

7 Building plan with indication of columns to be strengthened

8 Usually, two different techniques are used in the rehabilitation of damaged r.c. columns, according as FRP or steel is used as reinforcing material. In these cases two aspects must be considered in the choice of repair technique: the needs of a good confinement od the concrete, which can be assured by both techniques, and the efficiency of the reinforcement in transferring the stresses from the original column core, which carries the permanent loads, and the new parts, which can be obtained in a much more easy and reliable way using steel. In fact, while the additional steel reinforcement can be mechanically bonded to the existing concrete column using shear connectors, the FRP longitudinal reinforcement should relies on the surface grip between the adhesive agent and the concrete, which can fail due to peeling or delamination.

9 Strengthening of the column

10 concrete cover removal rust removal and passivation of the reinforcing bars

11 execution of holes in concrete necessary to allows the passage of connecting devices (threaded rods) positioning of transverse steel plates and of connecting devices using epoxy resin to anchor the rods and epoxy mortar to regularize the surface

12 positioning of the longitudinal reinforcement and of the end joints, devoted to connect the reinforcement to the foundation and to beams

13 positioning of the longitudinal reinforcement and of the end joints, devoted to connect the reinforcement to the foundation and to beams

14 welding of steel mesh to the steel execution of the additional epoxy mortar layer (s=50 mm)

15 execution of the additional epoxy mortar layer (s=50 mm) execution of the surface finish

16 CASE STUDY N. 2 EXECUTION OF ADDITIONAL STOREYS

17 General view of the existing building

18 +16,05 enlargment and execution of additional storeys +13,30 +13,30 +13,30 +10,30 +10,30 +10,30 micropiles columuns to be strengthened beams tyo be strengthened + 7,00 + 7,00 + 7,00 additional columns additional concrete slabs and walls existing columns new beeams + 3,70 +3,70 +3,70 existing beams additional floors existing floors a tratteggio le parti sezionate 0,00 + 0,15 + 0,30-1,55 Summary of the additions and of interventions needed to reassess the building (longitudinal cross section)

19 Type 6 Type 6 Type 7 Type 6 Type 7 Type 5 Type 6 NEW BEAM 400X750 Type 7 Type 7 Type 6 Type 6 Type 6 NEW BEAM 400X750 Type 6 Type 6 Type 6 Type 6 Type 6 Type 6 Type Type 6 new concrete slab s = 250 mm 800 Summary of the additions and of interventions needed to reassess the building (foundations)

20 / / / /60 New beam 300x / / /60 30/60 30/60 16/60 16/ /36 30/60 16/60 30/60 30/60 16/60 30/ /60 16/60 30/ /60 16/60 16/ / / /60 16/60 16/60 16/ Floor reinforcement s = 40 mm mesh. Ø8/200 Beam strengthening new shear walls Column strengthening new beams 300x450 Summary of the additions and of interventions needed to reassess the building (first floor)

21 Preliminary investigation phase

22 Hinged connection between the new and the existing column

23 Foundation enlargement

24 F SECTION F-F F Micropiles and shear wall

25 Beam reinforcement

26 Some picture during the execution

27 The building at the end of the works

28 CASE STUDY N. 3 REPAIR AND STRENGTHENING OF AN EARTHQUAKE DAMAGED BUILDING

29 Views of the existing building

30 SECOND FLOOR Via Enrico Berlinguer A B F37 F D C Fx A Plan of the 2nd floor B 8.00

31 7.35 ROAD LEVEL PORTICO Front view PORTICO Side view

32 Shear type collapse mechanism

33 Damages induced by the earthquake

34 Damages at the ends of the columns

35 Shear wall 1X new connecting beam shear wall 2X 8 38x shear wall 1Y PORTICO B new connecting beam Y 28 38x Shear wall 3X shear wall 3Y X 29 FIRST FLOOR PORTICO Shear wall 3Y Shear wall 4Y Shear walls system

36 ferri Ø12/20" ferri di ancoraggio Ø16/40" Pos. 6b 2 staffe Ø10/10" Pos. 5 ferri Ø10/10" Pos. 6b 2 staffe Ø10/10" E E 4 ferri Ø24 di ancoraggio 4 ferri Ø24 di ancoraggio Pos. 6b 2 staffe Ø10/15" Pos. 5 ferri Ø10/15" giunzione saldata 4+4 ferri Ø16 Pos. 6b 2 staffe Ø10/15" 4+4 ferri Ø16 Pos. 6b 2 staffe Ø10/10" Pos. 5 ferri Ø10/10" Pos. 6b 2 staffe Ø10/10" Pos. 6a 2 staffe Ø12/10" Pos. 5a ferri Ø12/10" Pos. 6a 2 staffe Ø12/10" 6 ferri Ø24 di ancoraggio 6 ferri Ø24 di ancoraggio Pos. 6a 2 staffe Ø12/15" Pos. 5a ferri Ø12/15" Pos. 6a 2 staffe Ø12/15" giunzione saldata 6+6 ferri Ø ferri Ø16 Pos. 6a 2 staffe Ø12/10" Pos. 5a ferri Ø12/10" ferri di ancoraggio Ø16/30" Pos. 6a 2 staffe Ø12/10" Pos. 6a 2 staffe Ø12/10" Pos. 5a ferri Ø12/10" 6 ferri Ø24 di ancoraggio giunzione saldata Pos. 6a 2 staffe Ø12/15" Pos. 5a ferri Ø12/15" 6+6 ferri Ø16 Pos. 6a 2 staffe Ø12/10" 6 ferri Ø24 di ancoraggio Pos. 6a 2 staffe Ø12/15" 6+6 ferri Ø16 Vertical section of a shear wall Pos. 6a 2 staffe Ø12/10" Pos. 5a ferri Ø12/10" Pos. 6a 2 staffe Ø12/10" 6 ferri Ø26 di ancoraggio Pos. 4 staffe Ø10/10" Pos. 6 2 staffe Ø10/10" Pos. 5 ferri Ø10/10" 6 ferri Ø26 di ancoraggio Pos. 6 2 staffe Ø10/10" ferri Ø26/10" di ancoraggio L= ferri Ø ferri Ø16 D Pos. 6 2 staffe Ø10/15" Pos. 5 ferri Ø10/15" Pos. 4 staffe Ø10/15" Pos. 6 2 staffe Ø10/15" D giunzione saldata Pos. 6 2 staffe Ø10/10" Pos. 5 ferri Ø10/10" Pos. 4 staffe Ø10/10" Pos. 6 2 staffe Ø10/10" Fondazione esistente ferri Ø16/40 SEZIONE D-D

37 Execution of the shear walls

38 Execution of the beam and column repairs

39 Execution of the connecting beams

40 Execution of the connecting beams

41 Imagination is much more important than knowledge (Albert Einstein) Thank you for your kind attention

2015 [ NEW PRODUCT ]

2015 [ NEW PRODUCT ] 2015 [NEW PRODUCT] 2015 NEW PRODUCT PATENT PENDING: BO2014A000415 The Fontanot mezzanine, in powder coated carbon steel, does not require building works. THE STRUCTURE The modular structure is composed

Dettagli

CULTURE & FACILITIES NEW COURT BUILDING NUOVO PALAZZO DI GIUSTIZIA

CULTURE & FACILITIES NEW COURT BUILDING NUOVO PALAZZO DI GIUSTIZIA NEW COURT BUILDING NUOVO PALAZZO DI GIUSTIZIA Date: Completed on 2009 Site: Firenze, Italy Client: INSO Spa Cost: 100 000 000 Structural Design, Architectural Design, Work Supervision, Safety Supervision:

Dettagli

ANALISI DI PANNELLI MURARI RINFORZATI CON FRP SOGGETTI A SOLLECITAZIONI DI TAGLIO

ANALISI DI PANNELLI MURARI RINFORZATI CON FRP SOGGETTI A SOLLECITAZIONI DI TAGLIO Università degli Studi di Salerno Dipartimento di Ingegneria Civile WORKSHOP 12-13 13 febbraio 27 Materiali ed Approcci Innovativi per il Progetto in Zona Sismica e la Mitigazione della Vulnerabilità delle

Dettagli

REGISTRATION GUIDE TO RESHELL SOFTWARE

REGISTRATION GUIDE TO RESHELL SOFTWARE REGISTRATION GUIDE TO RESHELL SOFTWARE INDEX: 1. GENERAL INFORMATION 2. REGISTRATION GUIDE 1. GENERAL INFORMATION This guide contains the correct procedure for entering the software page http://software.roenest.com/

Dettagli

PROPOSTE TESI 2014 LEGNO

PROPOSTE TESI 2014 LEGNO Docenti proponenti: prof. Piazza -Tomasi PROPOSTE TESI 2014 LEGNO LEGNO 1 Docenti proponenti: prof. Piazza -Tomasi Ipotesi di periodo tesi: aprile ottobre 2014 PARETI A PANNELLO A TELAIO LIGNEO E XLAM

Dettagli

REGISTRATION. Area Ricerca

REGISTRATION. Area Ricerca REGISTRATION Note: former students can skip the registration process and log in using their account (id123456) 1.1 HOW TO REGISTER: please, go to web page www.univr.it/applicationphd and select the item

Dettagli

Sezione 1 / Section 1. Elementi d identità: il marchio Elements of identity: the logo

Sezione 1 / Section 1. Elementi d identità: il marchio Elements of identity: the logo Sezione 1 / Section 1 2 Elementi d identità: il marchio Elements of identity: the logo Elements of identity: the logo Indice 2.01 Elementi d identità 2.02 Versioni declinabili 2.03 Versioni A e A1, a colori

Dettagli

GstarCAD 2010 Features

GstarCAD 2010 Features GstarCAD 2010 Features Unrivaled Compatibility with AutoCAD-Without data loss&re-learning cost Support AutoCAD R2.5~2010 GstarCAD 2010 uses the latest ODA library and can open AutoCAD R2.5~2010 DWG file.

Dettagli

Accessori / Accessories

Accessori / Accessories Accessori / Accessories Raccordo a 4 Vie 4-way Junction Realizzato in acciaio verniciato con polveri termoindurenti, permette di raccordare quattro elementi della trave ad un solo punto Realized in thermosetting

Dettagli

Noise and vibration control in multiplex cinemas

Noise and vibration control in multiplex cinemas Noise and vibration control in multiplex cinemas A. Farina ; P. Fausti Department of Industrial Engineering, University of Parma, Italy Department of Engineering, University of Ferrara, Italy Topics Design

Dettagli

We take care of your buildings

We take care of your buildings We take care of your buildings Che cos è il Building Management Il Building Management è una disciplina di derivazione anglosassone, che individua un edificio come un entità che necessita di un insieme

Dettagli

ANALISI DEI PERICOLI Hazard Analysis

ANALISI DEI PERICOLI Hazard Analysis 7.4 ANALISI DEI PERICOLI Hazard Analysis Identificazione Valutazione Misure di Controllo Identification Assessment Control Measures Taccani 1 7.4.2 Identificare i pericoli e i livelli accettabili Identify

Dettagli

INSTALLAZIONE INSTALLATION

INSTALLAZIONE INSTALLATION INSTALLAZIONE INSTALLATION KIT SOFFIONI MySlim A CONTROSOFFITTO KIT MySlim SHOWER HEADS FOR FALSE CEILING Art. KIT00006 AVVERTENZE: L impianto deve essere effettuato da personale autorizzato, certificato

Dettagli

INTERNET & MARKETING INNOVATIVE COMMUNICATION.

INTERNET & MARKETING INNOVATIVE COMMUNICATION. INTERNET & MARKETING INNOVATIVE COMMUNICATION www.sunet.it Passion Our passion to what we do every day allows us to have a special creativity and constantly improve the process of realization and execution.

Dettagli

COMMERCIAL TIGNÉ POINT SHOPPING CENTRE CENTRO COMMERCIALE TIGNÉ POINT

COMMERCIAL TIGNÉ POINT SHOPPING CENTRE CENTRO COMMERCIALE TIGNÉ POINT TIGNÉ POINT SHOPPING CENTRE CENTRO E TIGNÉ POINT The project is related to a roofed area of 50,000 m², with approximately 100,000 m³ of retail space, a supermarket, a football court on the roof terrace

Dettagli

INSTALLATION GUIDE ITA-ENG CATALYZER YAMAHA T-MAX

INSTALLATION GUIDE ITA-ENG CATALYZER YAMAHA T-MAX INSTALLATION GUIDE ITA-ENG C o d e : Y 1 1 3 C A T w w w. t e r m i g n o n i. c o m Y113CAT L i s ta c o m p o n e n t i P a c k i n g l i s t 2 w w w. t e r m i g n o n i. c o m Y113CAT L i s ta c o

Dettagli

Pubblicazioni COBIT 5

Pubblicazioni COBIT 5 Pubblicazioni COBIT 5 Marco Salvato CISA, CISM, CGEIT, CRISC, COBIT 5 Foundation, COBIT 5 Trainer 1 SPONSOR DELL EVENTO SPONSOR DI ISACA VENICE CHAPTER CON IL PATROCINIO DI 2 La famiglia COBIT 5 3 Aprile

Dettagli

L'altro massiccio. Prof. Dr. Ing. ARIO CECCOTTI. Università di Venezia IUAV Facoltà di Architettura

L'altro massiccio. Prof. Dr. Ing. ARIO CECCOTTI. Università di Venezia IUAV Facoltà di Architettura Il progetto SOFIE Prof. Dr. Ing. ARIO CECCOTTI IVALSA CNR Università di Venezia IUAV Facoltà di Architettura FOWL - Forest and Other Wooded Land Italia Italy land 29.4 M ha Italy FOWL 11.1 M ha Source:

Dettagli

TIMBER BUILDING SOLUTIONS. GEPS Glulam Externally Prestressed Structures

TIMBER BUILDING SOLUTIONS. GEPS Glulam Externally Prestressed Structures GEPS Glulam Externally Prestressed Structures Trave GEPS La Trave GEPS è costituita da travi di legno The GEPS Beam is composed by glulam beams lamellare precompresse con tiranti di acciaio ad alta pre-stressed

Dettagli

Technical Guidelines GON % Italian production. sports car oriented

Technical Guidelines GON % Italian production. sports car oriented The rubber nozzle mod GON (Gas Oval Nozzle) has the intake with 210 mm x 105 mm dimensions and has been developed by WORKY in order to be more SPORTS CAR oriented. It has been studied for vehicles with

Dettagli

F iber R einforced C ementitious M atrix

F iber R einforced C ementitious M atrix FRC M F iber R einforced C ementitious M atrix RUREDIL Chemical Specialities for Emerging Technologies Direzione Tecnica REINFORCING MATERIALS FRCM-Durability POLIPARAFENILENBENZOBISOXAZOLO (PBO) CEMENTITIOUS

Dettagli

Heat cost allocators Mounting manual

Heat cost allocators Mounting manual Heat cost allocators Mounting manual Ripartitori dei costi di calore - Manuale di montaggio pag. 1 Mounting the allocator on the heater Montaggio del ripartitore sul radiatore Allocator must be mounted

Dettagli

Manuale Handbook. Via Torino 16-15020 Piagera di Gabiano (AL) - ITALIA Tel.+ 39 0142 xxxxxx - fax +39 xxxxx. E-mail: support.race@dimsport.

Manuale Handbook. Via Torino 16-15020 Piagera di Gabiano (AL) - ITALIA Tel.+ 39 0142 xxxxxx - fax +39 xxxxx. E-mail: support.race@dimsport. DIMA 555PRO Manuale Handbook Via Torino 16-15020 Piagera di Gabiano (AL) - ITALIA Tel.+ 39 0142 xxxxxx - fax +39 xxxxx E-mail: supporto.race@dimsport.it E-mail: support.race@dimsport.it http://www.dimsport.it

Dettagli

Gi-Gi Art. 859 - User's Guide Istruzioni d'uso

Gi-Gi Art. 859 - User's Guide Istruzioni d'uso doc.4.12-06/03 Gi-Gi Art. 859 - User's Guide Istruzioni d'uso A belaying plate that can be used in many different conditions Una piastrina d'assicurazione che può essere utilizzata in condizioni diverse.

Dettagli

...DA OLTRE 30 ANNI FACCIAMO LA COSA CHE CI RIESCE MEGLIO, VENDITE E MANUTENZIONI DI VALORE... PIATTAFORME ELEVATRICI

...DA OLTRE 30 ANNI FACCIAMO LA COSA CHE CI RIESCE MEGLIO, VENDITE E MANUTENZIONI DI VALORE... PIATTAFORME ELEVATRICI ...DA OLTRE 30 ANNI FACCIAMO LA COSA CHE CI RIESCE MEGLIO, VENDITE E MANUTENZIONI DI VALORE... PIATTAFORME ELEVATRICI C.da Ralla - Tel. 0983.200665 87064 Corigliano Calabro http://www.kabergroupitalia.it

Dettagli

Mod. 1067 INTERFACCIA USB/KEY USB/KEY INTERFACE. Sch./Ref.1067/003

Mod. 1067 INTERFACCIA USB/KEY USB/KEY INTERFACE. Sch./Ref.1067/003 Mod. 1067 DS1067-019 LBT8388 INTERFACCIA USB/KEY USB/KEY INTERFACE Sch./Ref.1067/003 ITALIANO DESCRIZIONE GENERALE L interfaccia 1067/003 consente di collegare alla Centrale 1067/032 o 1067/042 (ver. 2.00

Dettagli

Heat cost allocators Mounting manual

Heat cost allocators Mounting manual - heat cost allocators ripartitori di calore Mounting Manual Manuale di montaggio Heat cost allocators Mounting manual Ripartitori dei costi di calore - Manuale di montaggio pag. 1 Mounting the allocator

Dettagli

Dimensioni 101mm x 71mm x 28mm (H) Alimentazione 12..24 Vac/Vcc Morsettiera o alimentatore plug, o da porta USB Connessioni lato RS232 e USB

Dimensioni 101mm x 71mm x 28mm (H) Alimentazione 12..24 Vac/Vcc Morsettiera o alimentatore plug, o da porta USB Connessioni lato RS232 e USB Sommario 1 Introduzione... 3 2 Dati tecnici... 3 2.1 Note generali di utilizzo... 3 3 DIMENSIONE E INSTALLAZIONE... 4 4 COLLEGAMENTI ELETTRICI... 5 4.1 Alternativa di collegamento lato PC... 5 4.2 Collegamento

Dettagli

Lanterne monoblocco Alta Gamma High size, one-piece bellhousings. Componenti - Components 04

Lanterne monoblocco Alta Gamma High size, one-piece bellhousings. Componenti - Components 04 Lanterne monoblocco Alta Gamma High size, one-piece bellhousings Componenti - Components 04 Con il fine di migliorare costantemente la qualità dei nostri prodotti, ci riserviamo il diritto di modificarne

Dettagli

Qualità e sicurezza delle costruzioni leggere

Qualità e sicurezza delle costruzioni leggere Qualità e sicurezza delle costruzioni leggere prof. dr. eng. Ario Ceccotti Istituto per la valorizzazione del legno e delle specie arboree CNR IVALSA Il LEGNO è la sola risorsa fondamentale rinnovabile

Dettagli

SRT064 BTH SRT051 BTH SRT052 BTH

SRT064 BTH SRT051 BTH SRT052 BTH KIT FOR TRUCK BRAKE TESTERS SRT051 BTH SRT052 BTH OPERATOR S MANUAL SRT064BTH SRT051BTH SRT052BTH CONTENTS 1. INTRODUCTION...1 2. Description of SRT064BTH Kit...2 3. Description of SRT051BTH Kit...2 4.

Dettagli

UNI EN ISO 12944-6. Corrosion protection of steel structures by protective paint systems. Laboratory performance test for

UNI EN ISO 12944-6. Corrosion protection of steel structures by protective paint systems. Laboratory performance test for via di Marmiceto, 6/C-56016 Ospeetto PISA P.IVA 01115340505 CCIAA Pi 101169 Report n 2050451/5 UNI EN ISO 12944-6 Corrosion protection of steel structures by protective paint systems Laboratory performance

Dettagli

DICHIARAZIONE DI PRESTAZIONE. n IT

DICHIARAZIONE DI PRESTAZIONE. n IT DICHIARAZIONE DI PRESTAZIONE n. 0021 IT 1. Codice di identificazione unico del prodotto-tipo: Riprese di getto con la resina a iniezione fischer FIS EM 2. Usi previsti: Prodotto Resina per connessioni

Dettagli

SILFRA SILFRA INNOVATION. in vendita presso/on sale at:

SILFRA SILFRA INNOVATION.  in vendita presso/on sale at: s i s t e m i p e r l a c q u a GRAPHIC DESIGNER GIROMINI - STAMPA TESTORI AT 4203 9/2005 s i s t e m i p e r l a c q u a Silfra S.p.A 2010 FontanetoD Agogna (NO) Italy Corso Italia, 1 Te l. +39 / 0322

Dettagli

Resources and Tools for Bibliographic Research. Search & Find Using Library Catalogues

Resources and Tools for Bibliographic Research. Search & Find Using Library Catalogues Resources and Tools for Bibliographic Research Search & Find Using Library Catalogues November 28, 2011 Donata Pieri Index Definition University of Padova Library System Catalogue CaPerE E-journals Catalogue

Dettagli

GIUNTO MODULARE - ALGAFLEX TM - MODULAR SYSTEM JOINT

GIUNTO MODULARE - ALGAFLEX TM - MODULAR SYSTEM JOINT Algaflex TM rappresenta l ultimo sviluppo nel campo dei giunti dilatazione, di una tecnologia ampiamente sperimentata da Alga, per le medie e grandi escursioni. La grande versatilità dei giunti Algaflex

Dettagli

Il giardino è un luogo senza tempo Garden is a timeless place

Il giardino è un luogo senza tempo Garden is a timeless place Il giardino è un luogo senza tempo Garden is a timeless place MATI 1909 MATI 1909 studies your environment, your needs and suggests you suitable proposals so that your garden becomes unique and original

Dettagli

Downloading and Installing Software Socio TIS

Downloading and Installing Software Socio TIS Object: Downloading and Installing Software Socio TIS compiler: L.D. Date Revision Note April 17 th 2013 --- For SO XP; Win 7 / Vista step Operation: Image A1 Open RUN by clicking the Start button, and

Dettagli

Fiori di campo. Conoscere, riconoscere e osservare tutte le specie di fiori selvatici più note

Fiori di campo. Conoscere, riconoscere e osservare tutte le specie di fiori selvatici più note Fiori di campo. Conoscere, riconoscere e osservare tutte le specie di fiori selvatici più note M. Teresa Della Beffa Click here if your download doesn"t start automatically Fiori di campo. Conoscere, riconoscere

Dettagli

Libretto uso e manutenzione. Owner s handbook. rev /07

Libretto uso e manutenzione. Owner s handbook. rev /07 Libretto uso e manutenzione Owner s handbook Elenco componenti List of components ALBERTO SASSI S.p.A. www.sassi.it 2 ALBERTO SASSI S.p.A. www.sassi.it 3 ALBERTO SASSI S.p.A. www.sassi.it 4 Tabella riferimento

Dettagli

Swimming Pool Kit & EaSy FEnCE. Kit Za BaZEnE

Swimming Pool Kit & EaSy FEnCE. Kit Za BaZEnE Swimming Pool Kit & EaSy FEnCE Per una piscina Bella Sicura e Certificata Kit Za BaZEnE For a beautiful, secure and certified swimming pool PRoFilE Paletti di riempimento. tutto inox Fill in pickets, all

Dettagli

I CAMBIAMENTI PROTOTESTO-METATESTO, UN MODELLO CON ESEMPI BASATI SULLA TRADUZIONE DELLA BIBBIA (ITALIAN EDITION) BY BRUNO OSIMO

I CAMBIAMENTI PROTOTESTO-METATESTO, UN MODELLO CON ESEMPI BASATI SULLA TRADUZIONE DELLA BIBBIA (ITALIAN EDITION) BY BRUNO OSIMO I CAMBIAMENTI PROTOTESTO-METATESTO, UN MODELLO CON ESEMPI BASATI SULLA TRADUZIONE DELLA BIBBIA (ITALIAN EDITION) BY BRUNO OSIMO READ ONLINE AND DOWNLOAD EBOOK : I CAMBIAMENTI PROTOTESTO-METATESTO, UN MODELLO

Dettagli

RICERCHE GEOFISICHE DI RESTI ARCHEOLOGICI SOTTO LA CATTEDRALE DI TARRAGONA (SPAGNA)

RICERCHE GEOFISICHE DI RESTI ARCHEOLOGICI SOTTO LA CATTEDRALE DI TARRAGONA (SPAGNA) GNGTS 26 Convegno Nazionale - Roma, 13 15 Novembre 2007 RICERCHE GEOFISICHE DI RESTI ARCHEOLOGICI SOTTO LA CATTEDRALE DI TARRAGONA (SPAGNA) TOMOGRAFIA GEOELETTRICA (2D E FULL-3D) E GPR A. Casas 1 P. Cosentino

Dettagli

ISOZAKI TOWER (CITYLIFE COMPLEX): A NEW

ISOZAKI TOWER (CITYLIFE COMPLEX): A NEW Technical-scientific seminar on Analysis and design of tall building structures University of Patras 16 May 214 h. 11:-18: ISOZAKI TOWER (CITYLIFE COMPLEX): A NEW OFFICE BUILDING IN MILAN (21-214) Structural

Dettagli

Esperienze nel settore Automotive

Esperienze nel settore Automotive Esperienze nel settore Automotive Tekna Automazione e Controllo lavora nel campo dell automazione industrial fornendo prodotti, Sistemi e servizi per l automazione ed il controllo delle line di produzione.

Dettagli

Tubi flessibili e tubi conduit. Flexible tubes and rigid conduits H Tubi flessibili EEx-d. Tubi rigidi conduit. Flexible tubes EEx-d

Tubi flessibili e tubi conduit. Flexible tubes and rigid conduits H Tubi flessibili EEx-d. Tubi rigidi conduit. Flexible tubes EEx-d Tubi flessibili e tubi conduit 1 2 Tubi flessibili EExd Tubi rigidi conduit Flexible tubes and rigid conduits 1 2 Flexible tubes EExd Rigid conduits 1 151 PROTEZIONE ANTIDEFLAGRANTE SP SPI SPN... II 2G

Dettagli

How to request the chains with attachments. Come richiedere le catene con attacchi

How to request the chains with attachments. Come richiedere le catene con attacchi Come richiedere le catene con attacchi Per prima cosa bisogna specificare il tipo di catena che si intende richiedere utilizzando i riferimenti Iso e ANSI. Il codice identificativo della catene deve essere

Dettagli

IL GIOVANE HOLDEN FRANNY E ZOOEY NOVE RACCONTI ALZATE LARCHITRAVE CARPENTIERI E SEYMOUR INTRODUZIONE BY JD SALINGER

IL GIOVANE HOLDEN FRANNY E ZOOEY NOVE RACCONTI ALZATE LARCHITRAVE CARPENTIERI E SEYMOUR INTRODUZIONE BY JD SALINGER IL GIOVANE HOLDEN FRANNY E ZOOEY NOVE RACCONTI ALZATE LARCHITRAVE CARPENTIERI E SEYMOUR INTRODUZIONE BY JD SALINGER READ ONLINE AND DOWNLOAD EBOOK : IL GIOVANE HOLDEN FRANNY E ZOOEY NOVE RACCONTI ALZATE

Dettagli

TEGOLE di ARDESIA CERAMICA CERAMIC SLATE ROOF TILES

TEGOLE di ARDESIA CERAMICA CERAMIC SLATE ROOF TILES TEGOLE di ARDESIA CERAMICA CERAMIC SLATE ROOF TILES 40x40 A00210 40x40 A00211 40x40 A00213 40x40 A00216 Sezione dei listelli: section of battens schema di montaggio assembly diagramme Taglio di gronda

Dettagli

la pelle di legno per la tua casa rivestimento per pavimenti porte e controsoffitti

la pelle di legno per la tua casa rivestimento per pavimenti porte e controsoffitti la pelle di legno per la tua casa rivestimento per pavimenti porte e controsoffitti A wooden skin for your home Timbering for floors, doors and false ceilings www.itlas.it Cinque millimetri di legno nobile

Dettagli

HIGH MASTS WITH FIXED PLATFORM

HIGH MASTS WITH FIXED PLATFORM HIGH MASTS WITH FIXED PLATFORM TORRIFARO A PIATTAFORMA FISSA È costituita da: FUSTO a sezione poligonale realizzato in lamiera d acciaio S355 JR UNI EN 10025 pressopiegato e saldato longitudinalmente.

Dettagli

RAPPORTO DI CLASSIFICAZIONE CLASSIFICATION REPORT 0412\DC\REA\12_5

RAPPORTO DI CLASSIFICAZIONE CLASSIFICATION REPORT 0412\DC\REA\12_5 RAPPORTO DI CLASSIFICAZIONE CLASSIFICATION REPORT 0412\DC\REA\12_5 Rapporto di classificazione di reazione al fuoco del prodotto : Reaction to fire classification report of product BETON COLOR Descrizione

Dettagli

Sistemi di distribuzione e pompaggio calcestruzzo. concrete pumping & PLacing systems.

Sistemi di distribuzione e pompaggio calcestruzzo. concrete pumping & PLacing systems. Sistemi di distribuzione e pompaggio calcestruzzo concrete pumping & PLacing systems www.pamec.com 2 GIUNTI COUPLINGS Sistemi di collegamento CONNECTING SYSTEMS > Sistema GU con guarnizione a doppio labbro

Dettagli

CONSORZIO STABILE VENITALY

CONSORZIO STABILE VENITALY CONSORZIO STABILE VENITALY Architecture and Engineering Interior Fittings Commercial Fittings-out Projects to Communicate Consorzio Stabile Venitaly Il Consorzio Stabile Venitaly ha come obbiettivo di

Dettagli

Trovare la quota del WC non è mai stato così facile! Finding the WC height has never been so easy!

Trovare la quota del WC non è mai stato così facile! Finding the WC height has never been so easy! Trovare la quota del WC non è mai stato così facile! Finding the WC height has never been so easy! OGNI BOX HA UNA LINEA TRATTEGGIATA CHE INDICA LA QUOTA DEL PAVIMENTO FINITO. Basta semplicemente misurare

Dettagli

1.10 STAFFE PER SANITARI SOSPESI SUSPENDED SANITARY BRACKETS

1.10 STAFFE PER SANITARI SOSPESI SUSPENDED SANITARY BRACKETS 1.10 STAFFE PER SANITARI SOSPESI SUSPENDED SANITARY BRACKETS 205 H STAFFE PER SANITARI - BRACKETS FOR SANITARY STAFFA ECO ECO BRACKET Per water e bidet For lavatories and bidet Fissaggio rapido e semplice

Dettagli

BUSINESS MISSION IN POLONIA - COMPANY PROFILE

BUSINESS MISSION IN POLONIA - COMPANY PROFILE BUSINESS MISSION IN POLONIA - COMPANY PROFILE COMPANY ADDRESS ZIP CODE PHONE NUMBER CITY FAX E-MAIL HOME-PAGE 1. MARKET SEGMENT: FURNITURE FABRICS / TEXTILE CONSTRUCTION ELECTRICAL COMPONENTS OTHER (pls.

Dettagli

WELCOME. Go to the link of the official University of Palermo web site www.unipa.it; Click on the box on the right side Login unico

WELCOME. Go to the link of the official University of Palermo web site www.unipa.it; Click on the box on the right side Login unico WELCOME This is a Step by Step Guide that will help you to register as an Exchange for study student to the University of Palermo. Please, read carefully this guide and prepare all required data and documents.

Dettagli

light light pensiline canopies

light light pensiline canopies pensiline Light è la linea di accessori per pensiline realizzata in acciaio inox Aisi 316 L, studiata per coniugare le esigenze di resistenza meccanica ad una elegante linea estetica. La gamma comprende,

Dettagli

How to use the WPA2 encrypted connection

How to use the WPA2 encrypted connection How to use the WPA2 encrypted connection At every Alohawifi hotspot you can use the WPA2 Enterprise encrypted connection (the highest security standard for wireless networks nowadays available) simply

Dettagli

Laguna d Oro Switzerland

Laguna d Oro Switzerland Laguna d Oro Switzerland Floor Plans www.pureintl.com Site Map Pool Building 1 Building 2 Building 3 Building 4 Lake Lugano Laguna d Oro 02 Elevation Level 5 Level 6 Level 4 Level 3 Level 1&2 (Parking/storage

Dettagli

ANODIZING EXCHANGE UNIT AND TEMPERATURE CONTROL

ANODIZING EXCHANGE UNIT AND TEMPERATURE CONTROL Scheda Tecnica / Technical sheet GRUPPO DI SCAMBIO E CONTROLLO TEMPERATURA OSSIDO AND TEMPERATURE CONTROL Per il raffreddamento dei bagni di anodizzazione vengono impiegati particolari gruppi di scambio.

Dettagli

07/02/2011. Elementi di Biomeccanica Statica, Cinetica, Esercizi sull analisi delle forze. Mechanics. Statics constant state of motion

07/02/2011. Elementi di Biomeccanica Statica, Cinetica, Esercizi sull analisi delle forze. Mechanics. Statics constant state of motion Elementi di Biomeccanica Statica, Cinetica, Esercizi sull analisi delle forze Mechanics Statics constant state of motion Dynamics acceleration present Kinetics of motionless systems Constant velocity systems

Dettagli

Una Ricerca Erboristica (Italian Edition)

Una Ricerca Erboristica (Italian Edition) Una Ricerca Erboristica (Italian Edition) Matteo Politi Click here if your download doesn"t start automatically Una Ricerca Erboristica (Italian Edition) Matteo Politi Una Ricerca Erboristica (Italian

Dettagli

The green and economical way for cooling and cleaning of tiles

The green and economical way for cooling and cleaning of tiles La via verde ed economica per il raffreddamento e la pulizia delle piastrelle by The green and economical way for cooling and cleaning of tiles Ing. Giacomo Davoli CORE BUSINESS FM è azienda leader nella

Dettagli

CODI/21 PIANOFORTE II // CODI/21 PIANO II

CODI/21 PIANOFORTE II // CODI/21 PIANO II MASTER di II livello - PIANOFORTE // 2nd level Master - PIANO ACCESSO: possesso del diploma accademico di II livello o titolo corrispondente DURATA: 2 ANNI NUMERO ESAMI: 8 (escluso l esame di ammissione)

Dettagli

KRIPTOS 40 _FRAMELESS

KRIPTOS 40 _FRAMELESS KRIPTOS 40 _FRAMELESS Kriptos 40 installato e completamente integrato nel cartongesso Kriptos 40 installed recessed into plaster ceiling 156_ ERREBILUCE KRIPTOS 40 _FRAMELESS La struttura di Kriptos 40

Dettagli

MODALITA DI IMPIEGO PD

MODALITA DI IMPIEGO PD MODALITA DI IMPIEGO PD MISURA CONCORDANZA/ 1. Accendere il dispositivo tramite interruttore a slitta situato sul lato destro; 2. All atto dell accensione il dispositivo esegue un test di funzionamento

Dettagli

UNIVERSITÀ DEGLI STUDI DI TORINO

UNIVERSITÀ DEGLI STUDI DI TORINO STEP BY STEP INSTRUCTIONS FOR COMPLETING THE ONLINE APPLICATION FORM Enter the Unito homepage www.unito.it and click on Login on the right side of the page. - Tel. +39 011 6704425 - e-mail internationalexchange@unito.it

Dettagli

L analisi di rischio come strumento chiave del project management in grandi progetti infrastrutturali

L analisi di rischio come strumento chiave del project management in grandi progetti infrastrutturali L analisi di rischio come strumento chiave del project management in grandi progetti infrastrutturali Dr. Marco Bettelini Amberg Engineering SA, Regensdorf-Watt Chi siamo Company founded in 1965 260 employees

Dettagli

CHECK AND STRAIGHTENING UNITS FOR SHAFTS, PIPES AND DIFFERENT PROFILES

CHECK AND STRAIGHTENING UNITS FOR SHAFTS, PIPES AND DIFFERENT PROFILES accessori per macchine utensili accessories for machine tools UNITÀ DI CONTROLLO E RDDRIZZTUR PER LBERI, TUBI E PROFILI DIVERSI CHECK ND STRIGHTENING UNITS FOR SHFTS, PIPES ND DIFFERENT PROFILES RDT 300

Dettagli

RIPARTITORI DI CALORE HEAT COST ALLOCATORS MANUALE DI MONTAGGIO MOUNTING MANUAL

RIPARTITORI DI CALORE HEAT COST ALLOCATORS MANUALE DI MONTAGGIO MOUNTING MANUAL RIPARTITORI DI CALORE HEAT COST ALLOCATORS MANUALE DI MONTAGGIO MOUNTING MANUAL Grazie di aver acquistato il nostro ripartitore di calore, prima di usarlo leggere il manuale d uso accuratamente e conservarlo

Dettagli

Spare parts

Spare parts TURBODRIVE 282 Spare parts 901.16940 Versions Description Date 901.16930 Emission: M. Gramegna 03/02/2009 901.16931 Modified drawings 14 15 17-22 and add drawings 16 03/03/2009 901.16932 Modified drawing

Dettagli

istruzioni di montaggio - manutenzione BUBBLE UP 300 MIN 160 MIN 160

istruzioni di montaggio - manutenzione BUBBLE UP 300 MIN 160 MIN 160 istruzioni di montaggio - manutenzione prodotto rispondente ai requisiti previsti dalle Direttive Comunitarie Europee NOTA BENE: le presenti istruzioni di montaggio informano l utilizzatore sulle corrette

Dettagli

VALVOLE AD OTTURATORE COMANDO PNEUMATICO

VALVOLE AD OTTURATORE COMANDO PNEUMATICO VALVOLE AD OTTURATORE COMANDO PNEUMATICO Attuatore con Pistone Pneumatico Corpo di Acciaio Inox A316, e Ottone Valvole Coassiali a Spola Comando Pneumatico ed Elettrico Corpo di Acciaio Inox A304 - A316

Dettagli

sottobasi per valvole a spola

sottobasi per valvole a spola sottobasi per valvole a spola manifolds for spool valves Sottobasi modulari per valvole a spola /8 e /4 Multiple sub-bases for /8 and /4 spool valves Sottobasi a posti fissi per valvole a spola /8 e /4

Dettagli

Il ruolo della EBM nel miglioramento della qualita della ricerca

Il ruolo della EBM nel miglioramento della qualita della ricerca Il ruolo della EBM nel miglioramento della qualita della ricerca Alessandro Liberati Centro Cochrane italiano XIII Riunione Annuale Network Cochrane italiano Workshop Napoli, 4 Novembre 2008 Contenuto

Dettagli

A NOVEL FEM METHOD FOR PREDICTING INSTABILITY

A NOVEL FEM METHOD FOR PREDICTING INSTABILITY Presented at the COMSOL Conference 2009 Milan POLITECNICO DI BARI A NOVEL FEM METHOD FOR PREDICTING THERMOACOUSTIC COMBUSTION INSTABILITY G. Campa S.M. Camporeale COMSOL Conference 2009, 14-1616 October

Dettagli

EGETTORE PER POMPE EJECTOR FOR PUMPS CARATTERISTICHE IDRAULICHE HYDRAULIC FEATURES

EGETTORE PER POMPE EJECTOR FOR PUMPS CARATTERISTICHE IDRAULICHE HYDRAULIC FEATURES CARATTERISTICHE IDRAULICHE HYDRAULIC FEATURES L'egettore per pompe è utilizzato per aspirare acqua da pozzi la cui profondità è superiore ai 7 metri / 25 piedi e può essere usato con pompe a motore elettrico

Dettagli

Quando mi collego ad alcuni servizi hosting ricevo un messaggio relativo al certificato di protezione del sito SSL, come mai?

Quando mi collego ad alcuni servizi hosting ricevo un messaggio relativo al certificato di protezione del sito SSL, come mai? IT FAQ-SSL Quando mi collego ad alcuni servizi hosting ricevo un messaggio relativo al certificato di protezione del sito SSL, come mai? Il certificato SSL relativo ai servizi hosting è stato rinnovato

Dettagli

Low pressure fittings. Unilock - Istruzioni di assemblaggio 12 - H. Unilock - Assembly Instructions

Low pressure fittings. Unilock - Istruzioni di assemblaggio 12 - H. Unilock - Assembly Instructions Unilock - Istruzioni di assemblaggio Unilock - Assembly Instructions Tagliare il tubo ad angolo retto con un coltello affilato. Se occorre, lubrificare (soluzione al 5% di sapone e 95% di acqua). ut the

Dettagli

500KG Rotaia, Appensione EMS 500KG Rail, Hangs. Automotore 500Kg Rotaia, Appensione 500KgEMS Track Rail, Hangs Scheda Tecnica Technical Paper

500KG Rotaia, Appensione EMS 500KG Rail, Hangs. Automotore 500Kg Rotaia, Appensione 500KgEMS Track Rail, Hangs Scheda Tecnica Technical Paper DIVISIONE Automotore elco s.r.l. 500KG Rotaia, Appensione EMS 500KG Rail, Hangs 1/1 Automotore 500Kg Rotaia, Appensione 500KgEMS Track Rail, Hangs Scheda Tecnica Technical Paper ROTAIA per carichi fino

Dettagli

CEDMEGA Rev 1.2 CONNECTION TUTORIAL

CEDMEGA Rev 1.2 CONNECTION TUTORIAL CEDMEGA Rev 1.2 CONNECTION TUTORIAL rev. 1.0 19/11/2015 1 www.cedelettronica.com Indice Power supply [Alimentazione]... 3 Programming [Programmazione]... 5 SD card insertion [Inserimento SD card]... 7

Dettagli

Ingegneria del Software Testing. Corso di Ingegneria del Software Anno Accademico 2012/2013

Ingegneria del Software Testing. Corso di Ingegneria del Software Anno Accademico 2012/2013 Ingegneria del Software Testing Corso di Ingegneria del Software Anno Accademico 2012/2013 1 Definizione IEEE Software testing is the process of analyzing a software item to detect the differences between

Dettagli

AVERE 30 ANNI E VIVERE CON LA MAMMA BIBLIOTECA BIETTI ITALIAN EDITION

AVERE 30 ANNI E VIVERE CON LA MAMMA BIBLIOTECA BIETTI ITALIAN EDITION AVERE 30 ANNI E VIVERE CON LA MAMMA BIBLIOTECA BIETTI ITALIAN EDITION READ ONLINE AND DOWNLOAD EBOOK : AVERE 30 ANNI E VIVERE CON LA MAMMA BIBLIOTECA BIETTI ITALIAN EDITION PDF Click button to download

Dettagli

I CORSI DI LAUREA MAGISTRALE NELL AREA DEI BENI CULTURALI E DEL TURISMO

I CORSI DI LAUREA MAGISTRALE NELL AREA DEI BENI CULTURALI E DEL TURISMO I CORSI DI LAUREA MAGISTRALE NELL AREA DEI BENI CULTURALI E DEL TURISMO Management dei beni culturali (LM-89) itourdem International Tourism and Destination Management (LM-49) Giornata della matricola

Dettagli

A.S. 2011/2012. Circuito semaforico da incrocio. Corso di Elettronica. Dipartimento di Elettrotecnica

A.S. 2011/2012. Circuito semaforico da incrocio. Corso di Elettronica. Dipartimento di Elettrotecnica A.S. 2011/2012 Circuito semaforico da incrocio Corso di Elettronica Dipartimento di Elettrotecnica Alunno: Bari Aldo 3E 1 Relazione Elettronica Realizzazione di un impianto semaforico da incrocio 2 Relazione

Dettagli

MODIFICA ATTACCHI BARRE PARACARENA HEPCO & BECKER PER APRILIA CAPONORD PER IL

MODIFICA ATTACCHI BARRE PARACARENA HEPCO & BECKER PER APRILIA CAPONORD PER IL MODIFICA ATTACCHI BARRE PARACARENA HEPCO & BECKER PER APRILIA CAPONORD PER IL MONTAGGIO DEL PARAMOTORE RALLY RAID ORIGINALE APRILIA OPPURE ARTIGIANALE EQUIVALENTE. HEPCO & BECKER DEDICATED CRASH BARS FOR

Dettagli

BRIGHT. // Schemi cablaggio // Wiring diagrams. // Istruzioni per il montaggio // Assembly instructions // ON/OFF. // emergenza+dali // emergency+dali

BRIGHT. // Schemi cablaggio // Wiring diagrams. // Istruzioni per il montaggio // Assembly instructions // ON/OFF. // emergenza+dali // emergency+dali Schemi cablaggio Wiring diagrams BRIGHT Istruzioni per il montaggio Assembly instructions OOFF emergenza+dali emergency+dali emergenza emergency dali EM EM EM EM DAI DAI D+ D- D+ D- Switch Dim D D D D

Dettagli

NATIONAL SPORT SCHOOL

NATIONAL SPORT SCHOOL NATIONAL SPORT SCHOOL Mark HALF-YEARLY EXAMINATION 2016 Level 4-6 FORM 1 ITALIAN TIME: 30 minutes LISTENING COMPREHENSION TEST (20 punti) Teacher s Paper Please first read the instructions carefully by

Dettagli

L adesivo poliuretanico certificato per costruzioni in legno The certified polyurethane adhesive for timber construction

L adesivo poliuretanico certificato per costruzioni in legno The certified polyurethane adhesive for timber construction L adesivo poliuretanico certificato per costruzioni in legno The certified polyurethane adhesive for timber construction Cos è lo? What is XILOBOND T? è un adesivo poliuretanico per costruzioni in legno.

Dettagli

PRODUCTION: PRODUZIONE FILO

PRODUCTION: PRODUZIONE FILO PRODUCTION: EDM WIRE PRODUZIONE FILO elettroerosione Brass wire 900 Nmm 2 Filo ottone 900 Nmm 2 900 We started our activity in 996 with a thirty-year experience and know-how of our technicians. Step by

Dettagli

SEMINARIO ASSIOM FOREX US ELECTIONS

SEMINARIO ASSIOM FOREX US ELECTIONS SEMINARIO ASSIOM FOREX US ELECTIONS Game change? (expectations, possible reactions, fx view) Diana Janostakova FX&MM Trader Milano, 4 novembre 2016 1 AGENDA 1. Actual expectations & market movements 2.

Dettagli

Sun paths in the sky. Solar diagrams and obstructions: shading systems design. Sun paths in the sky. Sun paths in the sky

Sun paths in the sky. Solar diagrams and obstructions: shading systems design. Sun paths in the sky. Sun paths in the sky Università IUAV di Venezia Corso di Fisica Tecnica Ambientale Laboratorio Integrato Innovazione-Sostenibilità Solar diagrams and obstructions: shading systems design Fabio Peron Università IUAV - Venezia

Dettagli

Rockworm. Armatura GFRP per Conci prefabbricati RWB. Patent pending n. RM2013A000141. ATP for underground and civil works

Rockworm. Armatura GFRP per Conci prefabbricati RWB. Patent pending n. RM2013A000141. ATP for underground and civil works Rockworm RWB Armatura GFRP per Conci prefabbricati Patent pending n. RM2013A000141 In tutte quelle situazioni di scavo meccanizzato con TBM, ogni qual volta sia necessario procedere ad una successiva demolizione

Dettagli

Programma pubblicazione Eurocodici Recepimenti, traduzioni, Corrigenda, Amendments, NDP, Appendici Nazionali. Pubblicazione CEN

Programma pubblicazione Eurocodici Recepimenti, traduzioni, Corrigenda, Amendments, NDP, Appendici Nazionali. Pubblicazione CEN Recepimenti, traduzioni, Corrigenda, Amendments,, Appendici Nazionali EN 1990 Eurocode - Basis of structural design EN 1990:2002 apr-02 NO mag-04 7 Approvata Assemblea EN 1991-1-1 Eurocode 1: Actions on

Dettagli

Guida all installazione del prodotto 4600 in configurazione plip

Guida all installazione del prodotto 4600 in configurazione plip Guida all installazione del prodotto 4600 in configurazione plip Premessa Questo prodotto è stato pensato e progettato, per poter essere installato, sia sulle vetture provviste di piattaforma CAN che su

Dettagli

GABBIE A RULLINI NEEDLE ROLLER AND CAGE ASSEMBLIES

GABBIE A RULLINI NEEDLE ROLLER AND CAGE ASSEMBLIES GABBIE A RULLINI NEEDLE ROLLER AND CAGE ASSEMBLIES Gabbie a rullini Needle roller and cage assemblies Le gabbie a rullini NBS costituiscono una parte dei cuscinetti volventi. Sono principalmente formate

Dettagli

SQ44. Squadre in acciaio inox bisellate c/cappello. Flat squares hardened stainless steel with 2 bevelled edges

SQ44. Squadre in acciaio inox bisellate c/cappello. Flat squares hardened stainless steel with 2 bevelled edges SQ41 Squadre in acciaio inox bisellate Squadre costruite con acciaio INOX 420, rettificate con tolleranza a norme DIN 875 TEMP. Valori ± (0,005 + L/50000) Flat squares hardened stainless steel with 2 bevelled

Dettagli

Data Alignment and (Geo)Referencing (sometimes Registration process)

Data Alignment and (Geo)Referencing (sometimes Registration process) Data Alignment and (Geo)Referencing (sometimes Registration process) All data aquired from a scan position are refered to an intrinsic reference system (even if more than one scan has been performed) Data

Dettagli